Skip to content
PlanIndex Get alerts
Menu

Planning application

WD/2026/0588/F

LAND AT WESTLYN (SOUTH OF POUNDFIELD ROAD) AND DAIRYLANDS (NORTH OF POUNDFIELD ROAD), CHALVINGTON BN27 3TQ

Refused Wealden Full

Proposal

DEMOLITION OF DWELLING AND ERECTION OF REPLACEMENT DWELLING AT WESTLYN. DEMOLITION OF EXISTING BUSINESS UNIT ON LAND KNOWN AS DAIRYLANDS AND ERECTION OF NEW SELF-BUILD DETACHED DWELLING. BOTH SITES TO INCLUDE LANDSCAPING WORKS.

As published by the council, reference WD/2026/0588/F

Timeline

Dates from the published record

  1. 19 Mar 2026

    Received by Wealden

  2. 30 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Refusal

  4. 25 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • WD/2008/1259/F Withdrawn

    LAND OFF POUNDFIELD ROAD CHALVINGTON BN27 3TQ.

    PROPOSED STABLES,TACK,AND HAY STORE.

    6 May 2008 134m away Full applications
  • CHURCH FARM, CHALVINGTON, HAILSHAM BN27 3TD

    CONSTRUCTION OF CAUSEWAY IN ACCORDANCE WITH ENVIRONMENT AGENCY ADVICE

    8 Feb 2008 137m away Lawful development
  • WD/2021/0691/F Granted

    CHURCH FARM, CHURCH FARM LANE, CHALVINGTON, BN27 3TD

    EXTENSION TO AGRICULTURAL BUILDING TO BE USED FOR THE STORAGE OF CROPS.

    17 Mar 2021 277m away Full applications
  • WD/2008/7007/AD Granted

    CHURCH FARM, CHALVINGTON, BN27 3TD.

    CONSTRUCTION OF NEW BARN FOR THE STORAGE OF GRAIN.

    14 Mar 2008 359m away Other
  • WD/2008/1387/F Granted

    LITTLE MEADOW STUD, CHURCH LANE, CHALVINGTON BN27 3TE

    STEEL FRAMED AGRICULTURAL EXTENSION FOR STORAGE OF HAY/STRAW AND MACHINERY

    22 May 2008 466m away Full applications
  • WD/2008/7009/AD Decided

    LITTLE MEADOW STUD, CHURCH LANE, CHALVINGTON

    STEEL FRAMED EXTENSION TO AGRICULTURAL BUILDING

    25 Mar 2008 478m away Other

In Wealden

  • WD/2026/1109/F Granted

    CHARLWOOD FARM LODGE, LEGSHEATH LANE, FOREST ROW, RH19 4JW

    PROPOSED SINGLE STOREY EXTENSION TO THE SIDE OF THE PROPERTY.

    3 Jun 2026 Full applications
  • WD/2026/0961/F Granted

    BYERLY, BELL LANE, FLETCHING, TN22 3YB

    DETACHED GARAGE

    12 May 2026 Full applications
  • WD/2026/0866/F Granted

    DOWNGATE LODGE, TIDEBROOK ROAD, WADHURST, TN5 6PB

    NEW PITCHED ROOF AT THE REAR OF THE PROPERTY (TO REPLACE SMALL FLAT ROOF) AND INSTALLATION OF ROOF MOUNTED SOLAR PANELS.

    28 Apr 2026 Full applications
  • WD/2026/1508/MAJ Awaiting decision

    BEWL WATER, BEWLBRIDGE LANE, COUSLEY WOOD, WADHURST, TN3 8JH

    PROPOSED SITING OF TEMPORARY STRUCTURES AND LIGHTING ASSOCIATED WITH THE HOLDING OF AN ANNUAL CHRISTMAS EVENT, FROM THE THIRD WEEK OF NOVEMBER UNTIL CHRISTMAS EVE, WITH THE SET-UP OF THE EVENT COMMENCING IN THE FIRST WEEK OF OCTOBER DURING THE YEAR IN WHICH THE EVENT IS BEING HELD AND THE SITE CLEARED DURING THE THIRD WEEK OF THE FOLLOWING JANUARY.

    27 Jul 2026 Full applications
  • WD/2026/1082/F Granted

    7 SAFFRON GROVE, CROWBOROUGH, TN6 2GJ

    LOFT CONVERSION AND ERECTION OF TWO REAR DORMERS, SIDE FACING JULIET BALCONY, A FRONT ROOFLIGHT AND AN EXTENSION TO THE EXISTING FLUE

    29 May 2026 Full applications