Planning application
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Works: Loft or dormer Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Listed building consent for change of use of office building to form a dwelling; alterations to elevations including installation of rooflights together with internal alterations to create a vaulted first floor.
As published by the council, reference WA/2026/00397
Application record
- Reference
- WA/2026/00397
- Type
- LB ALTERATIONS AND EXTENSIONS
- Status
- Permitted
- Decision
- Granted As published: LISTED BUILDING CONSENT GRANTED
- Received
- 2 Mar 2026
- Validated
- 2 Mar 2026
- Decided
- 5 Jun 2026
- Ward
- Farnham Castle
- Parish
- Farnham
- Decision by
- Delegated
- Postcode
- GU9 7HJ
Site history
Applications at this address on the Waverley register
This site has had 4 applications since 2024: 2 approved, 2 refused.
-
WA/2026/00396 Granted
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Change of use of office building to form a dwelling; alterations to elevations including installation of rooflights.
-
WA/2024/01094 Refused
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Listed building consent for internal and external works with installation of conservation rooflights.
-
WA/2024/01089 Refused
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Change of use of office building to one dwelling with installation of rooflights to provide habitable accommodation in roof space.
Timeline
Dates from the published record
-
2 Mar 2026
Received by Waverley
-
5 Jun 2026
Decision issued: LISTED BUILDING CONSENT GRANTED
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Waverley granted permission on 5 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Waverley's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Change of use of office building to form a dwelling; alterations to elevations including installation of rooflights.
Granted Full applications Loft or dormer 21 docsDomestic -
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Listed building consent for internal and external works with installation of conservation rooflights.
Refused Loft or dormer 14 docs -
Hart House 4, The Hart, Farnham, Surrey, GU9 7HJ
Change of use of office building to one dwelling with installation of rooflights to provide habitable accommodation in roof space.
Refused Full applications Loft or dormer 21 docsDomestic -
Timber Close 1, The Hart, Farnham, Surrey, GU9 7HE
Certificate of lawfulness under s192 for erection of extension following demolition of existing lean-to.
Granted Lawful development Extension Demolition 15 docs -
85A West Street, Farnham, GU9 7EN
76% historically approved · decision due ~22 Oct
Alterations to existing commercial building to provide 5 dwellings with associated parking bin and cycle storage; relevant demolition of an unlisted building in a conservation area.
Awaiting decision Full applications Demolition 39 docsSeveral homes -
104A, West Street, Farnham, Surrey, GU9 7EN
88% historically approved · decision due ~15 Sep
Application under regulation 77 of the conservation of habitats and species regulations 2017 for assessment of the proposal's effect on the integrity of the special protection site. The application relates to pra/2024/00959 general permitted development order 2015 schedule 2 part 3 class g - prior approval for change of use from commercial business and service (use class e) on ground floor to mixed use to provide two flats on upper floors (use class c3).
Awaiting decision New dwelling 7 docsSeveral homes