Planning application

South Farnham School, Menin Way, Farnham, Surrey, GU9 8DY

Granted Waverley WA/2025/02154 FULL APPLICATION

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a two storey extension to main school building.

As published by the council, reference WA/2025/02154

Application record

Reference
WA/2025/02154
Type
FULL APPLICATION
Status
Permitted
Decision
Granted
Received
28 Oct 2025
Validated
5 Nov 2025
Decided
27 Jan 2026
Ward
Farnham Moor Park
Parish
Farnham
Decision by
Delegated
Postcode
GU9 8DY

Timeline

Dates from the published record

  1. 28 Oct 2025

    Received by Waverley

  2. 5 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jan 2026

    Decision issued: Granted

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

52 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Abbey School, Menin Way, Farnham, Surrey, GU9 8DY

    TM/2024/01429 Submitted 22 Jul 2024 0m away

    Application for works to trees subject of tree preservation order 24/06

    Granted Trees 7 docs
  • The Abbey School, Menin Way, Farnham, Surrey, GU9 8DY

    WA/2026/00273 Submitted 16 Feb 2026 0m away

    Details of noise monitoring pursuant to condition 23 of planning permission wa/2024/01080 dated 25 september 2025 (this application is determined by surrey county council under their ref sccref-2025-0196) (county development application under regulation 3).

    Granted Outline 6 docs
  • Site Of Former Corner Cottage, Menin Way, Surrey

    WA/2018/0090 Submitted 21 Dec 2017 0m away

    Erection of 3 dwellings along with new access from tilford road following demolition of existing dwelling (as amended by plans received 19/04/2017) .

    Decided Full applications Demolition 90 docs
    Several homes
  • 16, Longley Road, Farnham, Surrey, GU9 8LZ

    WA/2026/01226 Submitted 29 Jun 2026 155m away

    Erection of single and two storey extensions and alterations including double height vaulted entrance porch; extension to existing dropped kerb and associated landscaping; removal of entrance gates and fence; demolition of existing single storey extension conservatory and detached garage

    Decided Householder Extension Demolition 17 docs
    Small domestic
  • 3, Longley Road, Farnham, Surrey, GU9 8LZ

    WA/2019/1775 Submitted 21 Oct 2019 155m away

    Erection of extensions and alterations following demolition of existing conservatory.

    Granted Householder Extension Demolition 26 docs
    Small domestic
  • 23 Longley Road, Farnham, GU9 8LZ

    WA/2022/02990 Submitted 24 Nov 2022 155m away

    Construction of a vehicle cross over and a dropped kerb

    Granted Householder 13 docs
    Small domestic

In Waverley

  • WA/2026/01034 Refused

    Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN

    Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.

    1 Jun 2026 Full applications
  • WA/2026/01278 Refused

    Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX

    Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.

    10 Jul 2026 Full applications
  • WA/2025/00812 Granted

    3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA

    Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.

    17 Apr 2025 Full applications
  • WA/2026/00664 Granted

    Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP

    Construction of an access track.

    9 Apr 2026 Full applications
  • WA/2026/01142 Granted

    Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB

    Erection of a stable block following demolition of existing stable block (part retrospective).

    17 Jun 2026 Full applications