Planning application

Sainsburys, Water Lane, Farnham, Surrey, GU9 9NJ

Granted Waverley WA/2025/01965 FULL APPLICATION

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single storey retail pod and roof solar panels.

As published by the council, reference WA/2025/01965

Application record

Reference
WA/2025/01965
Type
FULL APPLICATION
Status
Permitted
Decision
Granted
Received
6 Oct 2025
Validated
10 Oct 2025
Decided
28 Jan 2026
Ward
Farnham Weybourne and Badshot Lea
Parish
Farnham
Decision by
Delegated
Postcode
GU9 9NJ

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Waverley

  2. 10 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jan 2026

    Decision issued: Granted

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Waverley

  • WA/2026/01034 Refused

    Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN

    Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.

    1 Jun 2026 Full applications
  • WA/2026/01278 Refused

    Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX

    Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.

    10 Jul 2026 Full applications
  • WA/2025/00812 Granted

    3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA

    Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.

    17 Apr 2025 Full applications
  • WA/2026/00664 Granted

    Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP

    Construction of an access track.

    9 Apr 2026 Full applications
  • WA/2026/01142 Granted

    Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB

    Erection of a stable block following demolition of existing stable block (part retrospective).

    17 Jun 2026 Full applications