Skip to content
PlanIndex Get alerts
Menu

Planning application

11 15, West Street, Haslemere, Surrey, GU27 2AB

Granted Waverley WA/2025/01726 FULL APPLICATION

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 2 dac units and 2 outdoor ac condensers and removal of 3 existing condenser units together with installation of roof access door; alterations to eastern elevation to replace existing double entrance doors with single entrance door.

As published by the council, reference WA/2025/01726

Application record

Reference
WA/2025/01726
Type
FULL APPLICATION
Status
Permitted
Decision
Granted
Received
14 Aug 2025
Validated
11 Sep 2025
Decided
16 Jan 2026
Ward
Haslemere East and Grayswood
Parish
Haslemere
Decision by
Delegated
Postcode
GU27 2AB

Timeline

Dates from the published record

  1. 14 Aug 2025

    Received by Waverley

  2. 11 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Jan 2026

    Decision issued: Granted

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 44, West Street, Haslemere, Surrey, GU27 2AB

    WA/2018/0363 Submitted 2 Feb 2018 0m away

    Erection of a mixed use building to provide 2 dwellings at first floor level with commercial floor space below following relevant demolition of unlisted building in a conservation area (as amended by plans received 18/04/2018 and amplified by tree inform

    Decided Full applications Demolition Trees 78 docs
    Several homes
  • 40 Ryecote, West Street, Haslemere, Surrey, GU27 2AB

    WA/2026/01423 Submitted 4 Aug 2026 0m away

    Certificate of lawfulness under section 192 for a single storey extension to existing chiropractic clinic.

    Decided Lawful development Extension 5 docs
    Small domestic
  • 11 15, West Street, Haslemere, Surrey, GU27 2AB

    WA/2025/02063 Submitted 6 Oct 2025 0m away

    Display of illuminated and non-illuminated signage.

    Granted Advertising 40 docs
  • Charter Walk 4 5, West Street, Haslemere, Surrey, GU27 2AD

    WA/2018/0072 Submitted 5 Jan 2018 58m away

    Change of use of ground floor from retail (use class a1) to mixed use retail (use class a1) and beauty salon (use class suI generis) (follows invalid application wa/2017/1063).

    Decided Full applications 8 docs
  • 3 Former Haslemere Post Office, West Street, Surrey

    WA/2018/0765 Submitted 17 Apr 2018 68m away

    Change of use of existing post office (use class a1) to mixed use post office (use class a1) retail (use class a1) and wine bar (use class a4) together with addition of a mezzanine floor.

    Decided Full applications 29 docs
  • 18B, Lower Street, Haslemere, Surrey, GU27 2NX

    WA/2021/0519 Submitted 24 Feb 2021 91m away

    Change of use from professional/financial services (use class a2) to residential (use class c3) to form a single independent unit of accommodation including alterations to elevations.

    Granted Full applications 17 docs

In Waverley

  • WA/2026/01034 Refused

    Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN

    Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.

    1 Jun 2026 Full applications
  • WA/2026/01278 Refused

    Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX

    Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.

    10 Jul 2026 Full applications
  • WA/2025/00812 Granted

    3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA

    Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.

    17 Apr 2025 Full applications
  • WA/2026/00664 Granted

    Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP

    Construction of an access track.

    9 Apr 2026 Full applications
  • WA/2026/01142 Granted

    Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB

    Erection of a stable block following demolition of existing stable block (part retrospective).

    17 Jun 2026 Full applications