Skip to content
PlanIndex Get alerts
Menu

Planning application

The Studio, Old Compton Lane, Farnham, Surrey, GU9 8EH

Granted Waverley WA/2024/02177 FULL APPLICATION

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of replacement dwelling and detached garage following demolition of existing dwelling garage and outbuildings.

As published by the council, reference WA/2024/02177

Application record

Reference
WA/2024/02177
Type
FULL APPLICATION
Status
Permitted
Decision
Granted
Received
8 Nov 2024
Validated
8 Nov 2024
Decided
7 Jan 2025
Ward
Farnham Moor Park
Parish
Farnham
Decision by
Delegated
Postcode
GU9 8EH

Site history

Applications at this address on the Waverley register

This site has had 3 applications since 2024: 2 approved, 0 refused.

  • NMA/2025/02190 Granted

    The Studio, Old Compton Lane, Farnham, Surrey, GU9 8EH

    Amendment to wa/2024/02177 to make alterations to the design of the dwelling: change of roof material from zinc to slate removal of glazing bars to windows/doors removal of window on east elevation to master bedroom removal of side windows to entrance removal of window to dining area addition of flue and other minor elevational changes to fenestration.

    Decided 4 Dec 2025 Amendments
  • WA/2025/00181 Awaiting decision

    The Studio, Old Compton Lane, Farnham, Surrey, GU9 8EH

    Erection of a dwelling with associated landscaping.

    Submitted 24 Jan 2025 Full applications

Timeline

Dates from the published record

  1. 8 Nov 2024

    Received by Waverley

  2. 7 Jan 2025

    Decision issued: Granted

  3. 22 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Waverley granted permission on 7 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Elm Cottage, Old Compton Lane, Farnham, GU9 8EH

    WA/2026/00517 Submitted 2 Jan 2026 50 yards away

    Erection of a detached garage with office space above and external staircase; demolition of two existing outbuildings.

    Granted Householder Demolition 13 docs
    Domestic
  • The Studio, Old Compton Lane, Farnham, Surrey, GU9 8EH

    WA/2025/00181 Submitted 24 Jan 2025 50 yards away

    76% historically approved · decision due ~21 Mar

    Erection of a dwelling with associated landscaping.

    Awaiting decision Full applications New dwelling 61 docs
    Domestic
  • The Studio, Old Compton Lane, Farnham, Surrey, GU9 8EH

    NMA/2025/02190 Submitted 7 Nov 2025 50 yards away

    Amendment to wa/2024/02177 to make alterations to the design of the dwelling: change of roof material from zinc to slate removal of glazing bars to windows/doors removal of window on east elevation to master bedroom removal of side windows to entrance removal of window to dining area addition of flue and other minor elevational changes to fenestration.

    Granted Amendments Windows or glazing 8 docs
    Domestic
  • Thorncombe House, Old Compton Lane, Farnham, Surrey, GU9 8EH

    WA/2017/1383 Submitted 17 Jul 2017 50 yards away

    Erection of dwelling and garage (as amended by access plans recieved 14/09/2017).

    Granted Full applications New dwelling 60 docs
    Domestic
  • Deerfield House, Old Compton Lane, Farnham, Surrey, GU9 8EH

    TM/2023/00545 Submitted 8 Mar 2023 50 yards away

    Application for works to and removal of trees subject of tree preservation order 06/06

    Granted Trees 8 docs
  • Overwood House, Old Compton Lane, Farnham, Surrey, GU9 8EH

    WA/2026/01117 Submitted 17 Jun 2026 50 yards away

    Erection of extensions and alterations to elevations together with erection of detached garage/store following demolition of existing detached garage.

    Granted Householder Extension Demolition 18 docs
    Domestic

In Waverley

  • WA/2025/02136 Granted

    Little Hatch, Tennysons Lane, Haslemere, Surrey, GU27 3AF

    Erection of a dwelling with pv panels and air source heat pump together with a detached garage and associated works following demolition of existing single storey dwelling garage and outbuilding (as amended by plans and documents received on 30.01.2026 And 10.09.2026).

    Received 9 Sep, published by the council 30 Jul 2026 Full applications
  • WA/2026/01487 Refused

    Robins Farm, Fisher Lane, Chiddingfold, Godalming, Surrey, GU8 4TB

    Change of use of part of existing barn (north barn) to provide office and ancillary storage together with alterations to fenestration.

    Received 11 Aug, published by the council 16 Aug 2026 Full applications
  • WA/2026/01484 Granted

    Burton Pavilion, Milford Heath Road, Milford, Godalming, Surrey, GU8 5BX

    Erection of a single storey extension.

    Received 31 Jul, published by the council 16 Aug 2026 Full applications
  • WA/2026/01392 Granted

    Meadfields Farm, Three Gates Lane, Haslemere, Surrey, GU27 2LD

    Change of use of loft space above garage/store to provide a short-term holiday let.

    Received 29 Jul, published by the council 3 Aug 2026 Full applications
  • WA/2026/01432 Refused

    2 Flat 1, Rowland Road, Cranleigh, Surrey, GU6 8SW

    Erection of ground floor extension and alterations to elevations; erection of a garage/store with habitable accommodation above following demolition of existing garage/store (as amended by plans received 04/09/2026).

    Received 20 Jul, published by the council 11 Aug 2026 Full applications