Planning application
47 50, East Street, Farnham, Surrey, GU9 7SW
Works: Extension Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from restaurant (use class e) and takeaway (use class suI generis) to provide 4 dwellings (use class c3); erection of single storey extension to each dwelling together with private amenity space following demolition of existing single storey extension.
As published by the council, reference WA/2023/01364
Application record
- Reference
- WA/2023/01364
- Type
- FULL APPLICATION
- Status
- Permitted
- Decision
- Granted
- Received
- 5 Jun 2023
- Validated
- 12 Jun 2023
- Decided
- 12 Dec 2024
- Ward
- Farnham Moor Park
- Parish
- Farnham
- Decision by
- Delegated
- Postcode
- GU9 7SW
Timeline
Dates from the published record
-
5 Jun 2023
Received by Waverley
-
12 Jun 2023
Validated
Checked as complete and ready for consideration.
-
12 Dec 2024
Decision issued: Granted
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
65 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
68, East Street, Farnham, Surrey, GU9 7TP
Erection of first floor extension together with alterations to existing fenestration (as amplified by bat report received 14/10/2024 and as amended by revised plans received 16/10/2024).
Refused Householder Extension Windows or glazing 23 docsDomestic -
72A 72B, East Street, Surrey
Erection of extensions and alterations to existing flats (follows invalid application wa/2017/1280).
Decided Householder New dwelling Extension 21 docsDomestic -
Farnham Park 4, Upper South View, Farnham, Surrey, GU9 7GJ
Alterations to attached garage to provide habitable accommodation and erection of a cycle store.
Granted Householder 18 docsDomestic -
Farnham Park 4, Upper South View, Farnham, Surrey, GU9 7GJ
Alterations to elevation and integral garage to provide habitable accommodation. (Revision of wa/2021/03235)
Granted Householder 17 docsDomestic -
Farnham Park 4, Upper South View, Farnham, Surrey, GU9 7GJ
Alterations to elevation and integral garage to provide habitable accommodation.
Granted Householder 15 docsDomestic -
12, Thorold Road, Farnham, Surrey, GU9 7JY
Erection of single storey rear extension and alterations following demolition of existing conservatory (as amended by plans dated 29/05/2018).
Decided Householder Extension Demolition 17 docsSmall domestic
Other full applications applications
In Waverley
-
WA/2026/01034 Refused
Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN
Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.
-
WA/2026/01278 Refused
Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX
Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.
-
WA/2025/00812 Granted
3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA
Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.
-
WA/2026/00664 Granted
Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP
Construction of an access track.
-
WA/2026/01142 Granted
Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB
Erection of a stable block following demolition of existing stable block (part retrospective).