Planning application
Holt Farm, Old Lane, Farnham, GU10 4HG
Works: Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 2 dwellings landscaping and associated works following demolition of existing buildings (as amplified by bng report received 08/03/2023 updated 08/04/2023 and plan received 08/04/2023).
As published by the council, reference WA/2022/02347
Application record
- Reference
- WA/2022/02347
- Type
- FULL APPLICATION
- Status
- Permitted
- Decision
- Granted
- Received
- 9 Sep 2022
- Validated
- 15 Sep 2022
- Decided
- 3 May 2023
- Ward
- Frensham Dockenfield and Tilford
- Parish
- Dockenfield
- Decision by
- Delegated
- Postcode
- GU10 4HG
Timeline
Dates from the published record
-
9 Sep 2022
Received by Waverley
-
15 Sep 2022
Validated
Checked as complete and ready for consideration.
-
3 May 2023
Decision issued: Granted
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
111 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Holt Farm, Old Lane, Dockenfield, Farnham, Surrey, GU10 4HG
Erection of 2 detached dwellings landscaping and associated works following demolition of existing buildings and removal of hard surfacing.
Granted Full applications Demolition 50 docsMajor scheme -
Holt Farm, Old Lane, Dockenfield, Farnham, Surrey, GU10 4HG
Amendment to wa/2023/02489 - minor adjustments to window sizes and positions with internal layout alterations
Granted Amendments Windows or glazing 5 docs -
LAND AT JUNCTION OF HIGH THICKET LANE Cradle Lane, Frith End, Bordon, Hampshire
Outline planning application (access only) for 8 dwellings, garages and associated access, parking and landscaping
Decided OutlineSeveral homes
Other full applications applications
In Waverley
-
WA/2026/01034 Refused
Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN
Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.
-
WA/2026/01278 Refused
Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX
Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.
-
WA/2025/00812 Granted
3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA
Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.
-
WA/2026/00664 Granted
Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP
Construction of an access track.
-
WA/2026/01142 Granted
Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB
Erection of a stable block following demolition of existing stable block (part retrospective).