Skip to content
PlanIndex Get alerts
Menu

Planning application

Wey Valley House Flat 1, Mike Hawthorn Drive, Farnham, Surrey, GU9 7UQ

Granted Waverley WA/2022/01310 FULL APPLICATION

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of extensions and alterations to create 19 additional rooms (increase to 46 in total) together with 2 canopies bin and cycle stores landscaping additional parking and associated works.

As published by the council, reference WA/2022/01310

Application record

Reference
WA/2022/01310
Type
FULL APPLICATION
Status
Permitted
Decision
Granted
Received
4 Mar 2022
Validated
3 May 2022
Decided
6 Apr 2023
Ward
Farnham Moor Park
Parish
Farnham
Decision by
Delegated
Postcode
GU9 7UQ

Timeline

Dates from the published record

  1. 4 Mar 2022

    Received by Waverley

  2. 3 May 2022

    Validated

    Checked as complete and ready for consideration.

  3. 6 Apr 2023

    Decision issued: Granted

  4. 16 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

41 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Riverside Court 10, Mike Hawthorn Drive, Farnham, Surrey, GU9 7UE

    WA/2022/00039 Submitted 21 Sep 2021 54m away

    Application under regulation 3 for erection of extension and alterations to existing flat to provide 2 flats.

    Granted Other New dwelling Extension 22 docs
    Several homes
  • B P Service Station, Farnham By-Pass, Farnham, Surrey, GU9 8SS

    WA/2025/02104 Submitted 24 Oct 2025 136m away

    Installation of electric vehicle charging points with associated works including lighting and fences; installation of electrical substation.

    Granted Full applications 34 docs
  • Contec House, East Street, Farnham, Surrey, GU9 7SX

    WA/2025/01751 Submitted 26 Aug 2025 241m away

    Application under section 73 to vary condition 5 (restrictions on operational hours) of wa/2013/0844 to extend opening hours.

    Refused Conditions 20 docs
  • Romans Business Park Unit 4, East Street, Farnham, Surrey, GU9 7SX

    WA/2018/0106 Submitted 5 Jan 2018 241m away

    Certificate of lawfulness under section 192 for the use of the site as a mechanical and bodywork repair garage including mot testing.

    Granted Lawful development 9 docs
  • 47 50, East Street, Farnham, Surrey, GU9 7SW

    WA/2023/01364 Submitted 5 Jun 2023 252m away

    Change of use from restaurant (use class e) and takeaway (use class suI generis) to provide 4 dwellings (use class c3); erection of single storey extension to each dwelling together with private amenity space following demolition of existing single storey extension.

    Granted Full applications Extension Demolition 65 docs
    Several homes
  • 68, East Street, Farnham, Surrey, GU9 7TP

    WA/2024/01717 Submitted 30 Aug 2024 278m away

    Erection of first floor extension together with alterations to existing fenestration (as amplified by bat report received 14/10/2024 and as amended by revised plans received 16/10/2024).

    Refused Householder Extension Windows or glazing 23 docs
    Domestic

In Waverley

  • WA/2026/01034 Refused

    Blacklands Farm, Shackleford Road, Elstead, Godalming, GU8 6FN

    Erection of equestrian stables construction of a sand school detached grooms accommodation and tack room associated parking and landscaping following demolition of existing equestrian facilities and grooms accommodation.

    1 Jun 2026 Full applications
  • WA/2026/01278 Refused

    Batts Corner Spring Cottage, Boundary Road, Dockenfield, Farnham, Surrey, GU10 4EX

    Erection of a self/custom build two storey dwelling with solar panels to roof and detached garage with open store; associated amenity space and landscaping.

    10 Jul 2026 Full applications
  • WA/2025/00812 Granted

    3, Bourne Grove Close, Lower Bourne, Farnham, Surrey, GU10 3RA

    Erection of a detached self-build/custom-build dwelling and detached garage with associated works including solar roof panels driveway and landscaping.

    17 Apr 2025 Full applications
  • WA/2026/00664 Granted

    Birch Tree Cottage, Clock House Lane, Bramley, Guildford, Surrey, GU5 0AP

    Construction of an access track.

    9 Apr 2026 Full applications
  • WA/2026/01142 Granted

    Coturnix House, Rake Lane, Milford, Godalming, Surrey, GU8 5AB

    Erection of a stable block following demolition of existing stable block (part retrospective).

    17 Jun 2026 Full applications