A445 Leicester Lane Overbridge, Land at Leicester Lane, CV32 6OZ

Granted Warwick W/24/1177/HS2 HS2 applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London ? West Midlands) Act 2017 for works comprising: ? New overbridge structure, (Leicester Lane Overbridge) carrying the realigned A445 Leicester Lane over Furzen Hill Cutting; ? Earthworks to form approach embankments for the realignment of the existing A445 Leicester Lane, vehicle accesses and road vehicle parks, derailment bunds, drainage ditches and a balancing pond; ? Culvert headwalls and wingwalls for existing watercourse diversions and drainage; and pipe wingwalls and headwalls to act as a mammal passage with provision of galvanised steel safety guard rails on culvert wingwalls and headwalls greater than 1.2m in height; and ? Installation of a vehicle restraint system (VRS) located on both sides of the carriageway on the approach embankments on both sides of the overbridge.

As published by the council, reference W/24/1177/HS2

Application record

Reference
W/24/1177/HS2
Type
HS2 applications
Status
Decided
Decision
Granted
Received
29 Aug 2024
Validated
29 Aug 2024
Decided
7 Nov 2024
Ward
Cubbington and Leek Wootton
Parish
Cubbington
Decision by
Delegated

Timeline

Dates from the published record

  1. 29 Aug 2024

    Received by Warwick

  2. 7 Nov 2024

    Decision issued: Granted

  3. 23 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Warwick granted permission on 7 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.