Skip to content
PlanIndex Get alerts
Menu

Planning application

18 Wathen Road, Leamington Spa, CV32 5UX

Granted Warwick W/20/2179 Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey rear extensions and alteration to first floor bathroom

As published by the council, reference W/20/2179

Application record

Reference
W/20/2179
Type
Planning Permission
Status
Decided
Decision
Granted
Received
23 Dec 2020
Validated
15 Jan 2021
Decided
9 Sep 2021
Ward
Leamington Clarendon
Parish
Leamington Spa
Decision by
Delegated
Postcode
CV32 5UX

Timeline

Dates from the published record

  1. 23 Dec 2020

    Received by Warwick

  2. 15 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 9 Sep 2021

    Decision issued: Granted

  4. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Monmouthshire

31 applications on PlanIndex · across 10 councils · 93% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Wathen Road, Leamington Spa, CV32 5UX

    W/26/0323 Submitted 10 Mar 2026 15m away

    95% historically approved · decision due ~23 Sep

    Erection of dormer to the rear of house. Loft conversion. Installation of rooflights to front sid...

    Awaiting decision Loft or dormer
  • 33 Granville Street, Leamington Spa, CV32 5XW

    W/26/0839 Submitted 15 Jun 2026 91m away

    95% historically approved · decision due ~7 Aug

    Installation of new basement window and formation of a lightwell

    Decided Windows or glazing 12 docs
  • 43 Granville Street, Leamington Spa, CV32 5XW

    W/26/0985 Submitted 13 Jul 2026 91m away

    95% historically approved · decision due ~15 Sep

    Erection of a single storey, rear extension, with the addition of two rooflights serving the loft...

    Awaiting decision Extension Loft or dormer 15 docs
    Small domestic
  • 33 Brownlow Street, Leamington Spa, CV32 5XH

    W/26/0528 Submitted 20 Apr 2026 92m away

    95% historically approved · decision due ~21 Jul

    Proposed erection of a replacement rear extension, a rear and side infill extension, and a rear d...

    Awaiting decision Extension
  • 8 Brownlow Street, Leamington Spa, CV32 5XH

    W/23/0069 Submitted 19 Jan 2023 111m away

    Variation of Condition 2 (approved plans) of planning permission ref: W/21/2030 (Erection of proposed single storey side and rear courtyard extension following demolition of existing outbuildings. Erection of proposed rear dormer and installation of rear rooflight. to reflect amendments to the proposed roof design) for proposed amendments to roof design

    Granted Amendments Extension Loft or dormer +1 22 docs
    Small domestic
  • 2 Granville Street, Leamington Spa, CV32 5XN

    W/26/0396 Submitted 23 Mar 2026 135m away

    Erection of single storey side and rear infill extension

    Granted Full applications Extension 21 docs
    Small domestic

In Warwick

  • W/26/0306 Granted

    Stonebrook House, Narrow Lane, Lowsonford, Solihull, B95 5HN

    New garage at the front of the house, closer to the driveway, with dimensions smaller than those proposed under W/25/1758.

    9 Mar 2026 Full applications
  • W/26/0103 Granted

    The Royal Horse, Poseidon Way, Warwick, CV34 6SW

    Installation of 3no. electric vehicle charging stations, including the installation of 1no. substation, 1no. feeder pillar and underground cabling

    26 Jan 2026 Full applications
  • W/25/1750 Granted

    Unit 4, Cattell Road, Cape Industrial Estate, Warwick, CV34 4JN

    Change of use from light industrial with incidental office and storage (Use Class B2) to offices (Use Class E)

    17 Dec 2025 Full applications
  • W/26/0641 Granted

    34-36 High Street, Warwick, CV34 4BE

    Change of use from offices (Use Class E) to 2no. dwellings (Use Class C3), including internal alterations and alterations to rear fenestration.

    8 May 2026 Full applications
  • W/25/0302 Granted

    Topline Ventures Limited, Land off High Cross Lane, Pinley Green, CV35 7BG

    Erection of a rural workers dwelling together with all associated works.

    4 Mar 2025 Full applications