Skip to content
PlanIndex Get alerts
Menu

Planning application

37 Meadow Lane, Poulton-with-fearnhead, Warrington, WA2 0PN

Granted Warrington 2021/39323 Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Householder - Proposed single storey rear and side extension, new render finish and erection of a new porch

As published by the council, reference 2021/39323

Application record

Reference
2021/39323
Type
Full Planning
Status
Decision Issued
Decision
Approved with Conditions
Received
5 May 2021
Validated
5 May 2021
Decided
25 Jun 2021
Ward
Poulton North
Parish
ZZ - POULTON-WITH-FEARNHEAD
Decision by
Delegated
Postcode
WA2 0PN

Timeline

Dates from the published record

  1. 5 May 2021

    Received by Warrington

  2. 25 Jun 2021

    Decision issued: Approved with Conditions

  3. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Warrington

  • 2026/00827/FUL Status unknown

    Burtonwood Community Centre, BURTONWOOD COMMUNITY CENTRE Green Jones Brow, Burtonwood And Westbrook, Warrington, WA5 4LH

    Proposed single storey extension, landscaping including hardstanding, two parking spaces and ramps

    29 Jun 2026 Full applications
  • 2026/00816/FUL Status unknown

    Car Park, Apollo Retail Park Charon Way, Burtonwood And Westbrook, Warrington, WA5 7YA

    installation of electrical infrastructure to support an Electric Vehicle Charging Hub (EV Hub)

    25 Jun 2026 Full applications
  • 2026/00809/FUL Status unknown

    School Brow Retail Park Hopwood Street, Fairfield And Howley, Warrington, WA1 2TA

    Installation of six rapid electric vehicle (EV) charging stations and associated ancillary infrastructure including one fully accessible charging bay, substation, feeder pillar and associated works

    24 Jun 2026 Full applications
  • 2026/00810/FUL Status unknown

    B&q, B AND Q Delph Lane, Warrington, WA2 8RD

    Installation of electric vehicle charging points comprising chargePoint upstands, supporting electrical equipment, including a substation, cabinet infrastructure and electrical cabling.

    24 Jun 2026 Full applications
  • 2026/00787/FULM Status unknown

    GENESIS CENTRE Garrett Field, Birchwood, Warrington, WA3 7BH

    Refurbishment of roof pitched roof wings.

    18 Jun 2026 Full applications