Planning application
12 Millhouse Avenue, Stockton Heath, Warrington, WA4 2XF
Works: Extension Loft or dormer Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Householder - Proposed Partial first floor extension at the rear and hip-to gable extension including a rear dormer addition
As published by the council, reference 2021/38792
Application record
- Reference
- 2021/38792
- Type
- Full Planning
- Status
- Decision Issued
- Decision
- Approved with Conditions
- Received
- 22 Feb 2021
- Validated
- 22 Feb 2021
- Decided
- 16 Apr 2021
- Ward
- Stockton Heath
- Parish
- Stockton Heath
- Decision by
- Delegated
- Postcode
- WA4 2XF
Timeline
Dates from the published record
-
22 Feb 2021
Received by Warrington
-
16 Apr 2021
Decision issued: Approved with Conditions
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 Millhouse Avenue, Stockton Heath, Warrington, WA4 2XF
Demolition of existing single storey elements to rear and erection of a two storey rear extension and single storey rear extension.
Granted Householder Extension DemolitionSmall domestic -
5 Oakdale Avenue, Stockton Heath, Warrington, WA4 2XD
Householder - Proposed 2 storey side extension and single storey rear lean-to covered area
Granted Full applications Extension 12 docsSmall domestic -
11, OAKDALE AVENUE, STOCKTON HEATH, WARRINGTON, WA4 2XD
Application for variation of condition 4 of 97/36203 to remove restriction for occupancy by Mrs J Blight only
Granted Amendments 9 docs -
30 Raymond Avenue, Stockton Heath, Warrington, WA4 2XE
Works to roof to introduce new rear dormer, removal of front dormers and new solar inline panels
Granted Householder Loft or dormerDomestic -
52, MILL LANE, STOCKTON HEATH, WARRINGTON, WA4 2DD
Proposed removal of existing conservatory and construction of a single storey rear extension
Granted Full applications Extension 14 docsSmall domestic -
2 Raymond Avenue, Stockton Heath, Warrington, WA4 2UZ
Proposed amendment to upper rear extension window on previously approved application 2022/41592 (House extension)
Granted Amendments Extension Windows or glazing
Other full applications applications
In Warrington
-
2026/00827/FUL Status unknown
Burtonwood Community Centre, BURTONWOOD COMMUNITY CENTRE Green Jones Brow, Burtonwood And Westbrook, Warrington, WA5 4LH
Proposed single storey extension, landscaping including hardstanding, two parking spaces and ramps
-
2026/00816/FUL Status unknown
Car Park, Apollo Retail Park Charon Way, Burtonwood And Westbrook, Warrington, WA5 7YA
installation of electrical infrastructure to support an Electric Vehicle Charging Hub (EV Hub)
-
2026/00809/FUL Status unknown
School Brow Retail Park Hopwood Street, Fairfield And Howley, Warrington, WA1 2TA
Installation of six rapid electric vehicle (EV) charging stations and associated ancillary infrastructure including one fully accessible charging bay, substation, feeder pillar and associated works
-
2026/00810/FUL Status unknown
B&q, B AND Q Delph Lane, Warrington, WA2 8RD
Installation of electric vehicle charging points comprising chargePoint upstands, supporting electrical equipment, including a substation, cabinet infrastructure and electrical cabling.
-
2026/00787/FULM Status unknown
GENESIS CENTRE Garrett Field, Birchwood, Warrington, WA3 7BH
Refurbishment of roof pitched roof wings.