Planning application
Field to the south side of New Lane, Croft
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed new stable block, associated yard area and raising of land levels to facilitate new vehicle access onto New Lane and change of land use to equestrian use.
As published by the council, reference 2012/20358
Application record
- Reference
- 2012/20358
- Type
- Full Planning
- Status
- Decision made
- Decision
- Permitted
- Received
- 18 Jul 2012
- Validated
- 18 Jul 2012
- Decided
- 7 Dec 2012
- Ward
- Culcheth, Glazebury and Croft.DO NOT USE
- Parish
- CROFT
Timeline
Dates from the published record
-
18 Jul 2012
Received by Warrington
-
7 Dec 2012
Decision issued: Permitted
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Warrington granted permission on 7 December 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Warrington
-
2026/00827/FUL Status unknown
Burtonwood Community Centre, BURTONWOOD COMMUNITY CENTRE Green Jones Brow, Burtonwood And Westbrook, Warrington, WA5 4LH
Proposed single storey extension, landscaping including hardstanding, two parking spaces and ramps
-
2026/00816/FUL Status unknown
Car Park, Apollo Retail Park Charon Way, Burtonwood And Westbrook, Warrington, WA5 7YA
installation of electrical infrastructure to support an Electric Vehicle Charging Hub (EV Hub)
-
2026/00809/FUL Status unknown
School Brow Retail Park Hopwood Street, Fairfield And Howley, Warrington, WA1 2TA
Installation of six rapid electric vehicle (EV) charging stations and associated ancillary infrastructure including one fully accessible charging bay, substation, feeder pillar and associated works
-
2026/00810/FUL Status unknown
B&q, B AND Q Delph Lane, Warrington, WA2 8RD
Installation of electric vehicle charging points comprising chargePoint upstands, supporting electrical equipment, including a substation, cabinet infrastructure and electrical cabling.
-
2026/00787/FULM Status unknown
GENESIS CENTRE Garrett Field, Birchwood, Warrington, WA3 7BH
Refurbishment of roof pitched roof wings.