Planning application
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
As published by the council, reference 2026/3095
Application record
- Reference
- 2026/3095
- Type
- Application for Full Permission
- Status
- On-line
- Received
- 27 Aug 2026
- Validated
- 27 Aug 2026
- Postcode
- SW8 4UY
Timeline
Dates from the published record
-
27 Aug 2026
Received by Wandsworth
-
30 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wandsworth took a median of 60 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Griffin Primary School Stewarts Road SW8 4JB
Proposed erection of a building to form an indoor padel facility for three padel courts
Withdrawn Full applications -
37 Linford Street SW8 4UP
89% historically approved · decision due ~26 Aug
Demolition of existing two storey building and construction of a new four storey building including landscaping, cycle parking, access arrangements and refuse and recycling storage to be used for storage (Use Class B8) and general industrial (Use Class B2) purposes.
Awaiting decision Full applications Demolition 97 docs -
45 Pensbury Place SW8
Variation of condition 3 of planning permission dated 15/09/97 Ref: N/97/0852) to enable the approved use to operate between 5.00 and 19.00 Monday to Friday and 6.-00 to 15.00 on Saturday and at no other time, on a permanent basis.
Withdrawn Amendments 4 docs -
Westminster House 35 Pensbury Place SW8 4TR
89% historically approved · decision due ~26 Aug
Retention of eight (8) no. non-illuminated fascia signs on the southwestern elevation (retrospective).
Awaiting decision -
Telecommunication Station 168068 on rooftop of 180 Stewarts Road SW8 4UQ
89% historically approved · decision due ~25 Aug
Notification of intention to remove 3 no. AEQC antenna and install 3 no. AVHQB antenna, relocate of 1 no. OLO antenna on new support pole to existing support structure, reorientate 2 no. OLO antenna on existing steelwork, and ancillary works thereto.
Awaiting decision -
Westminster House 35 Pensbury Place London SW8 4TR
Details pursuant to part B of Condition 29 (BREEAM) of Planning Permission 2021/4277 dated 14/11/2022 (Demolition of existing buildings and construction of a warehouse/industrial (Use Class B2/B8) building providing two distinct units with associated offices, welfare facilities, service yard, vehicle and cycle parking and external landscaping).
Granted Full applications Demolition 5 docs
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows
-
2026/3086 Awaiting decision
128 Eversleigh Road SW11 5XB
Replacement timber windows, like for like