Planning application
The Ship 41 Jews Row London Wandsworth SW18 1TB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of new external AC condensers and relocation of existing external condenser
As published by the council, reference 2026/3082
Application record
- Reference
- 2026/3082
- Type
- Application for Full Permission
- Status
- On-line
- Received
- 27 Aug 2026
- Validated
- 27 Aug 2026
- Postcode
- SW18 1TB
Timeline
Dates from the published record
-
27 Aug 2026
Received by Wandsworth
-
30 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wandsworth took a median of 60 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Mercedes Benz Centre Jews Row SW18 1TB
Change of use to mixed Class E and sui generis (entertainment and leisure) for a temporary period of three years.
Withdrawn Full applications 7 docs -
The Original Tour Wandsworth Garage Jews Row SW18 1TB
89% historically approved · decision due ~10 Sep
Installation of new electrical infrastructure to provide a new point of connection to the local power network, comprising a GRP-Trunk Feeder Unit (TFU) and a 2 no. Transformers located near the eastern boundaries of the site.
Awaiting decision -
The Ship 41 Jews Row SW18 1TB
89% historically approved · decision due ~8 Sep
Erection of a freestanding demountable structure with a retractable awning system
Awaiting decision -
Wandsworth Garage The Original Tour London Sightseeing Jews Row SW18 1TB
89% historically approved · decision due ~6 Oct
Installation of electrical charging points and associated works.
Awaiting decision -
Wandsworth Garage The Original Tour London Sightseeing Jews Row SW18 1TB
89% historically approved · decision due ~21 Sep
Installation of 2 x transformers and 1 x GRP-Trunk Feeder Unit (TFU) located near the eastern boundaries of the site.
Awaiting decision -
The Original Tour, Wandsworth Garage, Jews Row SW18
Erection of two advertisement signs on the northeast corner of the building.
Withdrawn Advertising 3 docs
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows