Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Eatonville Road London Wandsworth SW17 7SH

Awaiting decision Wandsworth 2026/3060 Application for Full Permission

Works: Extension Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Rear pod second floor loft extension

As published by the council, reference 2026/3060

Application record

Reference
2026/3060
Type
Application for Full Permission
Status
On-line
Received
25 Aug 2026
Validated
25 Aug 2026
Postcode
SW17 7SH

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Wandsworth

  2. 30 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wandsworth took a median of 60 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 31 Eatonville Road SW17 7SH

    2026/2486 Submitted 20 Jul 2026 2m away

    Erection of an extension above the two-storey back addition, and installation of 5 x rooflights to the front roof slope.

    Granted Extension Loft or dormer
  • 31 Eatonville Road SW17 7SH

    2026/2853 Submitted 13 Aug 2026 2m away

    89% historically approved · decision due ~8 Oct

    Alterations including erection of mansard roof extension to main rear roof (with French doors and safety railings) and single-storey rear/side extension.

    Awaiting decision Extension Loft or dormer +1
    Small domestic
  • Flat Ground Floor 3 Eatonville Road SW17 7SH

    2026/2253 Submitted 22 Jul 2026 2m away

    Alterations including erection of single storey rear/side extension,

    Granted Extension
    Small domestic
  • 33 Eatonville Road SW17 7SH

    2025/4031 Submitted 6 Nov 2025 22m away

    Alterations including erection of single storey rear and side extension.

    Granted Householder Extension 16 docs
    Small domestic
  • 33 Eatonville Road SW17 7SH

    2025/4030 Submitted 6 Nov 2025 22m away

    Alterations including erection of mansard roof extension to main rear roof.

    Granted Householder Extension Loft or dormer 17 docs
    Domestic
  • 33 Eatonville Road SW17 7SH

    2025/3744 Submitted 20 Oct 2025 22m away

    Erection of roof extension above two storey back addition.

    Granted Lawful development Extension 17 docs

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications