Planning application
2026/2585
Arun Lodge 123 Earlsfield Road SW18 3DD
Proposal
Details of Proposed Bin and Cycle Store Plan pursuant to condition 4 of planning permission dated 30/04/2026 ref 2026/0697 (Alterations including erection of dormer roof extension to main rear roof and single storey rear extension in connection with enlargement of existing Large HMO (Sui Generis) from 7 bedrooms to 9 bedrooms.)
As published by the council, reference 2026/2585
Timeline
Dates from the published record
-
16 Jul 2026
Received by Wandsworth
-
21 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Wandsworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/0698 Granted
Arun Lodge 147 Earlsfield Road SW18 3DD
Alterations including erection of dormer roof extension to main rear roof and single storey rear extension in connection with enlargement of existing Large HMO (Sui Generis) from 7 bedrooms to 9 bedrooms.
-
2026/2586 Awaiting decision
Arun Lodge 147 Earlsfield Road SW18 3DD
Details of Proposed Bin and Cycle Store Plan pursuant to condition 4 of planning permission dated 30/06/2026 ref 2026/0698 (Alterations including erection of dormer roof extension to main rear roof and single storey rear extension in connection with enlargement of existing Large HMO (Sui Generis) from 7 bedrooms to 9 bedrooms.)
-
2026/2420 Awaiting decision
12 Dingwall Road SW18 3AZ
Existing use as 2 self contained flats.
-
2025/0302 Withdrawn
22 Bucharest Road SW18 3AR
Alterations including erection roof extension above two-storey back addition.
-
2013/2458 Withdrawn
9 Bassingham Road London SW18
Installation of solar panels on a flat roof
-
2026/1233 Awaiting decision
Flat First Floor 35 Brocklebank Road SW18 3AT
Alterations including erection of mansard roof extension to main rear roof with associated dormers (RECONSULTATION - AMENDED PLANS)
Other full applications applications
In Wandsworth
-
2026/2766 Awaiting decision
Flat Ground Floor A 7 Chelverton Road SW15 1RN
Proposed ground floor side infill, internal alterations, floor plan redesign and all associated works.
-
2026/2771 Awaiting decision
45 Eastwood Street London Wandsworth SW16 6PT
Conversion of a single dwellinghouse into 2 self-contained flats, including the erection of a single-storey rear extension.
-
2026/2770 Awaiting decision
30-38 Manville Road SW17 8JN
Windows reneval, redecorations and associated works.
-
2026/2765 Awaiting decision
2 A Rostella Road London Wandsworth SW17 0HY
Loft extension and roof terrace over part of rear outrigger
-
2026/2782 Awaiting decision
70 Barmouth Road London Wandsworth SW18 2DR
Installation of trellis on boundary wall