Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/1471

Garratt Lane Regeneration Site Phase 2 SW18 4DU (229 to 247 Garratt Lane and Brocklebank Health Centre 249 Garratt Lane Garages North of 35 Oakshaw Road)

Granted Wandsworth Details (following full perm.)

Proposal

Details of Materials pursuant to condition 12 of planning permission dated 02/10/2024 ref 2023/4840 (Demolition of all existing buildings/structures and erection of residential dwellings (Class C3), a new health centre (Class E), pharmacy (Class E), and two commercial units (Class E), together with the provision of enhanced pedestrian routes, landscaping and associated car parking and other ancillary works incidental to the development, to be constructed as a revised Phase 2 of the Garratt Lane and Atheldene Road redevelopment. [NB The proposals seek to provide a total of 113 residential units within this phase, all of affordable tenure, together with the new health centre and commercial units, in buildings ranging in height from 3 to 7 storeys.)

As published by the council, reference 2026/1471

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Wandsworth

  2. 30 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jun 2026

    Decision issued: Approve No Conditions

  4. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2026/0734 Awaiting decision

    Garratt Lane Regeneration Site Phase 2, SW18 4DU (229 to 247 Garratt Lane and Brocklebank Health Centre 249 Garratt Lane Garages North of 35 Oakshaw Road)

    Details of Piling Method Statement pursuant to condition 8 of planning permission dated 02/10/2024 ref 2023/4840 (Demolition of all existing buildings/structures and erection of residential dwellings (Class C3), a new health centre (Class E), pharmacy (Class E), and two commercial units (Class E), together with the provision of enhanced pedestrian routes, landscaping and associated car parking and other ancillary works incidental to the development, to be constructed as a revised Phase 2 of the Garratt Lane and Atheldene Road redevelopment. [NB The proposals seek to provide a total of 113 residential units within this phase, all of affordable tenure, together with the new health centre and commercial units, in buildings ranging in height from 3 to 7 storeys].)

    23 Feb 2026 0m away Full applications
  • 2026/0888 Awaiting decision

    Garratt Lane Regeneration Site Phase 2 SW18 4DU (229 to 247 Garratt Lane and Brocklebank Health Centre 249 Garratt Lane Garages North of 35 Oakshaw Road)

    Details of hard and soft Landscaping Scheme pursuant to condition 13 planning permission dated 02/10/2024 ref 2023/4840 (Demolition of all existing buildings/structures and erection of residential dwellings (Class C3), a new health centre (Class E), pharmacy (Class E), and two commercial units (Class E), together with the provision of enhanced pedestrian routes, landscaping and associated car parking and other ancillary works incidental to the development, to be constructed as a revised Phase 2 of the Garratt Lane and Atheldene Road redevelopment. [NB The proposals seek to provide a total of 113 residential units within this phase, all of affordable tenure, together with the new health centre and commercial units, in buildings ranging in height from 3 to 7 storeys].)

    5 Mar 2026 0m away Full applications
  • 2021/3763 Withdrawn

    40 Oakshaw Road SW18 3BS

    London Plane: Reduce canopy by approx. 5-6m from height and 3-4m from lateral branches (Pollard) to mitigate root growth and limit shading Reason: Routine maintenance

    9 Aug 2021 41m away Trees
  • 2021/1291 Granted

    Garratt Lane/ Atheldene Road Regeneration Site SW18 (229 to 247 and Brocklebank Health Centre 249 Garratt Lane, Garages North of 35 Oakshaw Road 80 Wilna Road Sherwood Lodge 71 and Land North of 40 Atheldene Road and 1 and 50-54 Waverton Road)

    Submission of details of amendments pursuant to Section 106 agreement attached to planning permission dated 31/07/2020 ref 2017/4141 (Demolition of existing buildings and erection of a mixed use development providing a total of 193 residential units (of both private and affordable tenure) including houses and apartments, with associated amenity space including gardens, balconies and terraces; a new health centre (Class D1 use) (1,873sq.m), a pharmacy (Class A1 use) (94sq.m), two commercial units (flexible Class A1/A2/A3 or B1 use) (189sq.m), within buildings ranging between two and five-storeys high, together with the provision of hard and soft landscaping, enhanced pedestrian routes, and associated car parking and cycle parking, with the development proposed to be constructed in two phases.) to allow an increase in affordable housing provision.

    5 Mar 2021 77m away Conditions
  • 2025/0009 Withdrawn

    Garratt Lane/ Atheldene Road Regeneration Site SW18 (229 to 247 and Brocklebank Health Centre 249 Garratt Lane, Garages North of 35 Oakshaw Road 80 Wilna Road Sherwood Lodge 71 and Land North of 40 Atheldene Road and 1 and 50-54 Waverton Road)

    Details of street furniture, play equipment and cycle parking (in respect of phase 2 only) pursuant to conditions 11, 13 and 32 of planning permission ref. 2017/4141 dated 31/07/2020 (Demolition of existing buildings and erection of a mixed use development providing a total of 193 residential units (of both private and affordable tenure) including houses and apartments, with associated amenity space including gardens, balconies and terraces; a new health centre (Class D1 use) (1,873sq.m), a pharmacy (Class A1 use) (94sq.m), two commercial units (flexible Class A1/A2/A3 or B1 use) (189sq.m), within buildings ranging between two and five-storeys high, together with the provision of hard and soft landscaping, enhanced pedestrian routes, and associated car parking and cycle parking, with the development proposed to be constructed in two phases).

    2 Jan 2025 77m away Full applications
  • 2026/1429 Awaiting decision

    178 Garratt Lane SW18 4ED

    Installation of new kitchen extraction unit and flue to the rear

    15 Apr 2026 97m away Full applications

In Wandsworth

  • 2026/2766 Awaiting decision

    Flat Ground Floor A 7 Chelverton Road SW15 1RN

    Proposed ground floor side infill, internal alterations, floor plan redesign and all associated works.

    31 Jul 2026 Full applications
  • 2026/2771 Awaiting decision

    45 Eastwood Street London Wandsworth SW16 6PT

    Conversion of a single dwellinghouse into 2 self-contained flats, including the erection of a single-storey rear extension.

    31 Jul 2026 Full applications
  • 2026/2770 Awaiting decision

    30-38 Manville Road SW17 8JN

    Windows reneval, redecorations and associated works.

    31 Jul 2026 Full applications
  • 2026/2765 Awaiting decision

    2 A Rostella Road London Wandsworth SW17 0HY

    Loft extension and roof terrace over part of rear outrigger

    31 Jul 2026 Full applications
  • 2026/2782 Awaiting decision

    70 Barmouth Road London Wandsworth SW18 2DR

    Installation of trellis on boundary wall

    31 Jul 2026 Full applications