Planning application
48 Ingelow Road SW8 3PF
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations including erection of single-storey rear/side extension and installation of replacement windows.
As published by the council, reference 2026/1090
Application record
- Reference
- 2026/1090
- Type
- Application for Full Permission
- Status
- FINAL DECISION
- Decision
- Approve with Conditions
- Received
- 18 Mar 2026
- Validated
- 16 Apr 2026
- Decided
- 10 Jun 2026
- Ward
- Shaftesbury & Queenstown
- Decision by
- Delegated Standard
- Postcode
- SW8 3PF
Timeline
Dates from the published record
-
18 Mar 2026
Received by Wandsworth
-
16 Apr 2026
Validated
Checked as complete and ready for consideration.
-
10 Jun 2026
Decision issued: Approve with Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
56 A Ingelow Road SW8 3PF
Alterations including erection of mansard roof extension to main rear roof (with French doors and safety railings) formation of roof terrace above two-storey back addition with 1.7m high screen surround. Installation of replacement windows.
Granted Full applications Extension Loft or dormer +1 10 docs -
17 Prairie Street SW8 3PT
Replacement of existing timber framed roof lights to conservation style PVC framed roof lights to the front roofslope.
Granted Householder Loft or dormer 11 docsDomestic -
67 Ingelow Road SW8 3PE
Replacement of two wooden framed windows on the ground floor level at the rear of the property with uPVC double glazed equivalents.
Withdrawn Full applications Windows or glazing -
121-123 Queenstown Road SW8 3RH
Installation of an external gas valve to the front of the property; installation of 13 metres of 1 inch steer riser up the left-hand side of the front elevation, across the roof of the shop front, and up the first elevation; and associated internal works.
Withdrawn Full applications Windows or glazing 6 docs -
73 A Stanley Grove SW8 3PJ
89% historically approved · decision due ~30 Apr
Alterations including erection of rear roof extension to main rear roof including raising the ridge by 300mm and extension above part of two-storey back addition with three rooflights to the front roof slope.
Awaiting decision Full applications Extension Loft or dormer 23 docs -
84 Ingelow Road SW8 3PF
Retention of replacement of 4 x single-glazed with 4 x double-glazed timber sash windows.
Granted Windows or glazing
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows