Skip to content
PlanIndex Get alerts
Menu

Planning application

126 Church Lane SW17 9PU

Refused Wandsworth 2026/0841 Application for Full Permission

Works: New dwelling Extension Loft or dormer

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of part single part two storey rear extension, rear mansard roof extension to main roof and above two storey back addition, conversion of property into 1 x 3-bedroom, 1 x 2-bedroom, 3 x 1-bedroom flats with associated refuse and cycle storage, hard and soft landscaping and boundary treatment.

As published by the council, reference 2026/0841

Application record

Reference
2026/0841
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Refuse
Received
3 Mar 2026
Validated
17 Mar 2026
Decided
13 May 2026
Ward
Tooting Bec
Decision by
Delegated Standard
Postcode
SW17 9PU

Timeline

Dates from the published record

  1. 3 Mar 2026

    Received by Wandsworth

  2. 17 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 13 May 2026

    Decision issued: Refuse

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 126 Church Lane SW17 9PU

    2025/3648 Submitted 10 Oct 2025 0m away

    Erection of an extension above the two-storey back addition; Erection of a single storey rear extension.

    Granted Lawful development Extension 8 docs
    Small domestic
  • 100 Lucien Road SW17 8HN

    2023/0206 Submitted 18 Jan 2023 26m away

    Variation of condition 2 (in accordance with approved drawings) pursuant to planning permission dated 12/11/2021 ref 2021/5188 (Alterations including erection of a mansard roof extension (with french door and safety railing) to the main rear roof) so as to allow change from mansard style roof extension to vertical full width roof extension. [retrospective]

    Refused Amendments Extension Loft or dormer 8 docs
  • 100 Lucien Road SW17 8HN

    2024/3260 Submitted 24 Sep 2024 26m away

    Alterations including erection of roof extension to main roof and above two-storey back addition. (Part retrospective application)

    Granted Householder Extension 9 docs
    Domestic
  • 99 Lucien Road SW17 8HS

    2021/3174 Submitted 5 Jul 2021 50m away

    Alterations including erection of mansard roof extension to main rear roof (with French doors and safety railings) and extension above part of two-storey back addition; formation of roof terrace above two-storey back addition with 1.7m high screen surround to create 1x 1-bedroom flat

    Granted Full applications Extension Loft or dormer +1 10 docs
  • 112 Church Lane SW17 9PT

    2023/0346 Submitted 30 Jan 2023 60m away

    Alterations including erection of single-storey rear extension.

    Granted Householder Extension 18 docs
    Small domestic
  • Hill House Day Centre 117 Church Lane SW17 9PW

    2025/4548 Submitted 16 Dec 2025 84m away

    Installation of three air source heat humps (ASHP) including fencing to enclose and installation of solar panels at roof level.

    Granted Full applications 16 docs

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications