Planning application
298 Trinity Road SW18 3RG
Works: Extension Loft or dormer Trees Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of arboricultural method statement and Tree Protection measures pursuant to conditions 6 and 7 planning permission dated 11/02/2026 ref 2025/4469 (Alterations including erection of mansard roof extension to main rear roof and erection of single storey rear/side extension.)
As published by the council, reference 2026/0709
Application record
- Reference
- 2026/0709
- Type
- Details (following full perm.)
- Status
- FINAL DECISION
- Decision
- Approve No Conditions
- Received
- 16 Feb 2026
- Validated
- 26 Feb 2026
- Decided
- 5 May 2026
- Ward
- Wandsworth Common
- Decision by
- Delegated Standard
- Postcode
- SW18 3RG
Timeline
Dates from the published record
-
16 Feb 2026
Received by Wandsworth
-
26 Feb 2026
Validated
Checked as complete and ready for consideration.
-
5 May 2026
Decision issued: Approve No Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
298 Trinity Road SW18 3RG
Alterations including erection of mansard roof extension to main rear roof and erection of single storey rear/side extension.
Granted Householder Extension Loft or dormer 7 docsSmall domestic -
294 Trinity Road SW18 3RG
Formation of a vehicular crossover; partial demolition and partial rebuild of the front boundary wall, formation of hardstanding and installation of vehicle turntable to the front garden.
Refused Householder Demolition 14 docsSmall domestic -
-
-
3 Henderson Road SW18 3RR
Alterations including erection of single-storey rear/side extension; erection of single-storey outbuilding. Excavation to enlarge basement including formation rear and front lightwell.
Granted Householder Extension 10 docsSmall domestic -
5 Henderson Road SW18 3RR
Alterations including installation of flat roof to existing ground floor rear/side extension and insertion of sliding patio doors in rear elevation; replacement of rear lightwell railings with flush metal grilles over.
Granted Householder Extension Windows or glazing 10 docsDomestic
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows