Skip to content
PlanIndex Get alerts
Menu

Planning application

57 Unit B Nine Elms Lane SW11 7DE

Granted Wandsworth 2026/0675 Details (following full perm.)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details pursuant to the partial discharge of Condition 28 (Commercial use) and 50 (Noise Insulation) in respect of Unit B, Plot B only of planning permission 2019/2250 dated 18/12/2020.

As published by the council, reference 2026/0675

Application record

Reference
2026/0675
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
17 Feb 2026
Validated
2 Mar 2026
Decided
12 Jun 2026
Ward
Nine Elms
Decision by
Delegated Standard
Postcode
SW11 7DE

Timeline

Dates from the published record

  1. 17 Feb 2026

    Received by Wandsworth

  2. 2 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jun 2026

    Decision issued: Approve No Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 57 Unit E Nine Elms Lane SW11 7DE

    2026/0706 Submitted 12 Feb 2026 0m away

    Installation of 6no. branded awnings, 2no. illuminated projecting signs, 1no. illuminated fascia sign, 1no. vinyl sign.

    Withdrawn Advertising
  • Unit D Plot B 57 Nine Elms Lane SW11 7DE

    2025/4567 Submitted 17 Dec 2025 0m away

    Submission of details pursuant to the partial discharge of Condition 28 (Distribution of uses), Condition 47 (Forecourt and outdoor space details), and Condition 50 (Noise Insulation) in respect of Unit D, Plot B only of planning permission 2019/2250 dated 18/12/2020.

    Granted Full applications 5 docs
  • 57 Unit E Nine Elms Lane SW11 7DE

    2026/2009 Submitted 29 May 2026 0m away

    89% historically approved · decision due ~24 Jul

    Submission of details pursuant to the partial discharge of Condition 28 (Distribution of uses), Condition 47 (Forecourt and outdoor space details), and Condition 50 (Noise Insulation) in respect of Unit E only of planning permission 2019/2250 dated 18/12/2020.

    Awaiting decision Full applications
  • 57 Unit E Nine Elms Lane SW11 7DE

    2026/0617 Submitted 4 Sep 2026 2m away

    89% historically approved · decision due ~30 Oct

    Alterations to shopfront, to include removal of double door and installation of replacement single door and replacement glazing panel. Alterations of doors from inward swing to outward swing, change of 2no. doors from double leaf to single leaf.

    Awaiting decision Windows or glazing
  • 55 Unit B Nine Elms Lane SW11 7DS

    2024/4372 Submitted 13 Dec 2024 40m away

    1. To provide vinyl signages in the designed signage zone behind glass. 2. To provide an illuminated projecting signage behind the retail elevation at high level, the projecting metal sign is 750mm x 750mm in size, formed of a metal frame finish, and infilled with frosted glass on both sides.

    Withdrawn Advertising 4 docs
  • 55 Unit D Nine Elms Lane SW11 7DS

    2026/0452 Submitted 3 Feb 2026 45m away

    Submission of details pursuant to the partial discharge of Condition 50 (Noise Insulation) in respect of Unit D, Plot D only of planning permission 2019/2250 dated 18/12/2020.

    Granted Full applications 4 docs

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications