Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat Ground Floor 17 Canford Road SW11 6PA

Granted Wandsworth 2026/0017 Application for Full Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear extension.

As published by the council, reference 2026/0017

Application record

Reference
2026/0017
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
5 Jan 2026
Validated
16 Jan 2026
Decided
3 Mar 2026
Ward
Northcote
Decision by
Delegated Standard
Postcode
SW11 6PA

Timeline

Dates from the published record

  1. 5 Jan 2026

    Received by Wandsworth

  2. 16 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 3 Mar 2026

    Decision issued: Approve with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 6 Bowood Road SW11 6PE

    2025/3844 Submitted 24 Oct 2025 39m away

    Demolition of the existing side extension. Alterations including erection of side extension and timber pergola to the rear.

    Granted Householder Extension Demolition 18 docs
    Domestic
  • 173 Wakehurst Road SW11 6BP

    2025/3122 Submitted 8 Sep 2025 50m away

    Excavation to create an enlarge basement including formation of front and rear lightwells with grille over.

    Granted Householder 17 docs
    Domestic
  • Flat Ground Floor 185 Wakehurst Road SW11 6BP

    2026/1725 Submitted 26 May 2026 54m away

    Alterations including erection of single storey side/rear and rear extensions.

    Granted Extension
    Small domestic
  • Ground Floor Flat 21 Bowood Road SW11 6PE

    2021/2345 Submitted 17 May 2021 61m away

    Erection of single storey side and rear extension.

    Granted Full applications Extension 8 docs
    Small domestic
  • 114 Flat Ground Floor B Clapham Common West Side SW4 9BA

    2023/0126 Submitted 13 Jan 2023 65m away

    Acer tree in the front garden: Crown reduce, reducing the lateral branches by approx. 3.5m leaving approx. 3m crown spread, reducing vertical branches by approx. 4m leaving approx. 4.5 vertical crown spready.

    Decided Trees 2 docs
  • 110 Clapham Common West Side SW4 9AZ

    2026/0074 Submitted 7 Jan 2026 78m away

    Alterations including erection of single-storey rear/side extension Replacement of ground floor rear bay window with doors. Replacement of outbuilding in rear garden.

    Granted Householder Extension Windows or glazing 22 docs
    Small domestic

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications
  • 2026/3082 Awaiting decision

    The Ship 41 Jews Row London Wandsworth SW18 1TB

    Installation of new external AC condensers and relocation of existing external condenser

    27 Aug 2026 Full applications
  • 2026/3073 Awaiting decision

    1 Gracedale Road SW16 6SW

    Single storey rear extension to house a dining room. Alterations to the existing side stores to form part of the new kitchen. Works to include upgrading the fabric of the existing stores and providing a new roof and rooflights to the stores. Replacement windows to the side and rear of the existing house.

    26 Aug 2026 Full applications