Planning application

111 Mitcham Lane SW16 6LY

Granted Wandsworth 2025/4658 Application for Full Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations including formation of rear lightwell with external staircase to existing commercial unit.

As published by the council, reference 2025/4658

Application record

Reference
2025/4658
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
24 Dec 2025
Validated
23 Jan 2026
Decided
23 Mar 2026
Ward
Furzedown
Decision by
Delegated Standard
Postcode
SW16 6LY

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Wandsworth

  2. 23 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Mar 2026

    Decision issued: Approve with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 111 Mitcham Lane SW16 6LY

    2026/1456 Submitted 17 Apr 2026 0m away

    Determination as to whether prior approval is required for change of use from commercial (Class E use) at ground-floor and basement to two residential flats (Class C3 use).

    Refused Prior approval New dwelling 11 docs
  • 5 The Boulevard Balham High Road SW17

    2026/1455 Submitted 17 Apr 2026 0m away

    Determination as to whether prior approval is required for part change of use from commercial space (Class E) at lower ground level to one residential flat (Class C3).

    Granted Prior approval 5 docs
  • 105 Mitcham Lane SW16 6LQ

    2026/0382 Submitted 29 Jan 2026 14m away

    Determination as to whether prior approval is required for change of use of office at ground floor level from (Class E) to residential (Class C3) to provide 1 x 2-bedroom flats.

    Granted Prior approval New dwelling 10 docs
  • Ground Floor 105 Mitcham Lane London SW16 6LY

    2024/3755 Submitted 25 Oct 2024 14m away

    Determination as to whether prior approval is required for change of use from commercial (Class E) to 1 x 1-bedroom flat (Class C3).

    Granted Prior approval 14 docs
  • Ground Floor 116 Mitcham Lane SW16 6NR

    2020/0093 Submitted 10 Jan 2020 37m away

    Alterations including erection of two dormer extensions to main rear roof with windows to existing two-storey back addition, roof alterations to single-storey back addition and part change of retail (Class C3) to residential (Class C3) in connection with conversion of property into 1 x 1-bedroom dwelling houses and 2 x 2 bedroom dwellings.

    Withdrawn Full applications Extension Loft or dormer +2 14 docs
    Small domestic
  • 111 Mitcham Lane SW16 6LY

    2026/2332 Submitted 30 Jun 2026 38m away

    89% historically approved · decision due ~25 Aug

    Determination as to whether prior approval is required for change of use from commercial (Class E use) at ground-floor and basement to two residential flats (Class C3 use).

    Awaiting decision New dwelling

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications