Skip to content
PlanIndex Get alerts
Menu

Planning application

11A Steerforth Street SW18 4HH

Granted Wandsworth 2025/4154 Application for Full Permission

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations including erection of a mansard extension (with French doors and safety railings) to main rear roof, including raising the ridge by 300mm; Extension above part of the two-storey back addition; Formation of a roof terrace above the two-storey back addition with 1.7m high obscured screen surround.

As published by the council, reference 2025/4154

Application record

Reference
2025/4154
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
17 Nov 2025
Validated
24 Nov 2025
Decided
15 Jan 2026
Ward
Wandsworth Common
Decision by
Delegated Standard
Postcode
SW18 4HH

Timeline

Dates from the published record

  1. 17 Nov 2025

    Received by Wandsworth

  2. 24 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jan 2026

    Decision issued: Approve with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 470-472 Garratt Lane SW18 4HJ

    2021/1488 Submitted 29 Mar 2021 48m away

    Erection of a dormer extension to main rear roof slope with French doors and safety railings, raising of ridge line by 300mm and extension over two-storey rear addition.

    Granted Full applications Extension Loft or dormer +1 6 docs
  • 468 Garratt Lane SW18 4HL

    2021/4036 Submitted 31 Aug 2021 57m away

    Erection of an extension to the main rear roof slope with the erection of a two-storey first and second floor extension as part of the conversion of the property into 2 X 1-Bedroom and 1 X 2-Bedroom flats.

    Withdrawn Full applications New dwelling Extension 22 docs
  • 3 Sheringham Court Garratt Lane SW17

    2011/2086 Submitted 12 May 2011 66m away

    French doors

    Withdrawn Full applications Windows or glazing 4 docs
  • Flat First Floor A 9 Thorndean Street SW18 4HE

    2026/1518 Submitted 22 Apr 2026 70m away

    Erection of a rear mansard roof extension involving raising ridge 300mm, extension above two-storey rear addition and creation of roof terrace with 1.7m high obscured glazed balustrade

    Granted Full applications Extension Loft or dormer +1 11 docs
  • 625 Garratt Lane SW18 4SX

    2024/3548 Submitted 15 Oct 2024 74m away

    Alterations including erection of a mansard extension to main rear roof including raising the ridge height by 100mm; erection of an extension above two-storey rear addition with formation of second floor rear roof terrace enclosed by 1.7m high obscured glass screen; erectoin of part single, part two-storey rear addition; insertion of new shopfront. Works in connection with the proposed conversion of the property into 4 self contained flats, with commercial use retained at front ground floor and basement level.

    Refused Full applications New dwelling Extension +3 12 docs
  • 635 Garratt Lane SW18 4SX

    2026/2350 Submitted 22 Jul 2026 82m away

    89% historically approved · decision due ~16 Sep

    Alterations including demolition of existing single-storey garage and erection of two-storey one-bedroom dwelling house.

    Awaiting decision Demolition
    Small domestic

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications