Skip to content
PlanIndex Get alerts
Menu

Planning application

Lower Ground To Mezzanine Floors 495 Battersea Park Road SW11 4LW

Granted Wandsworth 2025/3770 Details (following full perm.)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of Refuse and Recycling pursuant to condition 2 of prior approval dated 13/08/2025 ref 2025/1723 (Determination as to whether prior approval is required for change of use from Restaurant (Class E) to 1 x 2-bedroom flat (Class C3).).

As published by the council, reference 2025/3770

Application record

Reference
2025/3770
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
21 Oct 2025
Validated
30 Oct 2025
Decided
16 Dec 2025
Ward
Battersea Park
Decision by
Delegated Standard
Postcode
SW11 4LW

Timeline

Dates from the published record

  1. 21 Oct 2025

    Received by Wandsworth

  2. 30 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Dec 2025

    Decision issued: Approve No Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 495 Battersea Park Road SW11 4LW

    2025/3110 Submitted 5 Sep 2025 0m away

    Removal of existing restaurant signage, alterations to fenestration including installation of 3x replacement windows to the front and replacement windows to the side/rear elevation. Installation of a flat rooflight within the existing flat roof.

    Granted Full applications Loft or dormer Windows or glazing 13 docs
  • Lower Ground To Mezzanine Floors 495 Battersea Park Road SW11 4LW

    2021/2296 Submitted 13 May 2021 2m away

    Alterations including erection of a single storey (plus basement) rear/side extension and rear access stair to ground floor ; Removal of existing shopfront, signage and awning, and installation of replacement obscured glass and entrance door; In connection with change of use from bar/restaurant (Sui generis) to residential (Class C3) to provide 2 x 1-bed flats, including associated refuse and cycle storage.

    Refused Full applications New dwelling Extension +1 12 docs
    Small domestic
  • 491 Battersea Park Road SW11 4LW

    2025/3024 Submitted 29 Aug 2025 33m away

    Variation of condition 13 (opening hours) of planning permission dated 17/08/2011 ref 2011/0185 (Demolition of existing buildings and construction of a new five/three-storey building comprising of two blocks to provide 64 flats with balconies and roof gardens, two retail units (approx 400 sq.m of floorspace), 46 car parking spaces, 72 cycle spaces: associated plant equipment and refuse storage; plus various highway improvements) as amended by 2013/0504 to allow amendment to opening hours to 0600hours and 2130hours. [current opening hours 0730 to 2130] .

    Granted Amendments New dwelling Demolition 7 docs
    Major scheme
  • 491 Battersea Park Road SW11 4LW

    2025/3828 Submitted 24 Oct 2025 33m away

    Display of two non-illuminated fascia signs and welcome sign above doorway.

    Granted Advertising 7 docs
  • 481 Battersea Park Road SW11 4LW

    2026/1129 Submitted 23 Mar 2026 33m away

    Installation of replacement shopfront and additional doors; Installation of click and collect lockers to shopfront.

    Granted Full applications Windows or glazing 10 docs
  • 481 Battersea Park Road SW11 4LW

    2025/3396 Submitted 26 Sep 2025 33m away

    Installation of a new shopfront.

    Granted Full applications Windows or glazing 10 docs

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications