Planning application
7 Soudan Road SW11 4HH
Works: Loft or dormer Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of Tree Protection Plan and Arboricultural Method statement and survey pursuant to condition 4 of planning permission dated 29/08/2025 ref 2025/1991 (Excavation to enlarge existing basement, formation of front lightwell with grille over and rear walk on rooflight).
As published by the council, reference 2025/3066
Application record
- Reference
- 2025/3066
- Type
- Details (following full perm.)
- Status
- FINAL DECISION
- Decision
- Approve No Conditions
- Received
- 2 Sep 2025
- Validated
- 11 Sep 2025
- Decided
- 27 Oct 2025
- Ward
- Battersea Park
- Decision by
- Delegated Standard
- Postcode
- SW11 4HH
Timeline
Dates from the published record
-
2 Sep 2025
Received by Wandsworth
-
11 Sep 2025
Validated
Checked as complete and ready for consideration.
-
27 Oct 2025
Decision issued: Approve No Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 Soudan Road SW11 4HH
Front: Honey Locust - Reduce all over by approximately 2.5 metres. Rear: Pittosporum - Trim all over as much as possible.
Decided Trees 3 docs -
Flat Second Floor 18 Albert Bridge Road SW11 4PY
Alterations including erection of dormer roof extension to main rear roof (with French doors) and formation of roof terrace above three-storey back addition with 1.1m high metal railings surround.
Granted Householder Extension Loft or dormer +1 7 docsDomestic -
12 B Albert Bridge Road SW11 4PY
Erection of mansard roof extension to main rear roof slope and extension above part of three-storey back addition.
Granted Full applications Extension Loft or dormer 11 docs -
36 Brynmaer Road SW11 4EW
Erection of a single storey rear and side extension.
Granted Householder Extension 9 docsSmall domestic -
Flat Second Floor C, 34 Albert Bridge Road SW11 4PY
Alterations including erection of single storey rear extension at second floor level.
Granted Full applications Extension 21 docsSmall domestic -
31 Albert Bridge Road SW11 4PX
T01 - London Plane - Re - pollard back to previous growth points. T02 - Cherry - Crown reduce by 2.0m back to previous points. T03 - Ash - Prune back to boundary. Tree is in neighbouring property.
Decided Trees 3 docs
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows