Skip to content
PlanIndex Get alerts
Menu

Planning application

4 B Ormeley Road SW12 9QE

Granted Wandsworth 2023/0707 Application for Full Permission

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations including erection of a hip to gable extension with three rooflights to front main roof slope and one rooflight on top of the rear roof.

As published by the council, reference 2023/0707

Application record

Reference
2023/0707
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
21 Feb 2023
Validated
6 Mar 2023
Decided
21 Apr 2023
Ward
Balham
Decision by
Delegated Standard
Postcode
SW12 9QE

Timeline

Dates from the published record

  1. 21 Feb 2023

    Received by Wandsworth

  2. 6 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Apr 2023

    Decision issued: Approve with Conditions

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 A Ormeley Road SW12 9QE

    2022/5126 Submitted 14 Dec 2022 0m away

    Alterations including erection of single- storey rear and side extension; new front window to replace entrance door; new entrance door to the side/front wall of the property, removal of canopy on top of the existing entrance door.

    Granted Full applications Extension Windows or glazing 25 docs
    Small domestic
  • 1 Laitwood Road SW12 9QN

    2023/1511 Submitted 20 Apr 2023 35m away

    83% historically approved · decision due ~29 Jun

    Removal of condition 5 of planning permission dated 13/03/1986 ref 85/S/1770 (Alterations including the erection of a rear extension and rooms in the roof space in connection with the use of the premises as hostel accommodation) to remove restriction on accommodation being for single mothers only and to be exercised by no other organisation other than registered housing trust or association.

    Awaiting decision Amendments Extension 2 docs
  • The Devonshire, Public House 39 Balham High Road SW12 9AN

    2026/2099 Submitted 24 Jun 2026 82m away

    Alterations including external redecoration works to shopfront and ground floor window and door of existing public house.

    Granted Windows or glazing
  • 92 A Balham High Road SW12 9AF

    2025/3938 Submitted 3 Nov 2025 85m away

    Erection of 7 x food kiosks in front courtyard.

    Refused Full applications 10 docs
  • 96-100 Balham High Road SW12 9AA

    2021/1280 Submitted 17 Mar 2021 86m away

    Alterations in connection with change of use of rear basement and ground floor levels from retail (Class E) to residential (Class C3) to create 1 x 1-bedroom and 2 x 2-bedroom flats and erection of part single/part two/part three storey rear extensions at first floor levels to extend existing dwellings, formation of rear roof terraces with 1.7m obscured glazed screening surrounds, provision of cycle and refuse storage and outdoor amenity space.

    Granted Full applications New dwelling Extension +1 36 docs
  • 74 A Caistor Mews SW12 8QW

    2026/1467 Submitted 9 Jul 2026 93m away

    Alterations including change of use of from light industrial unit (Class B1(c)) to single familly dwelling (Class C3). Erection of dormer rear roof extension, installation of rooflights and replacement of fenestration.

    Withdrawn Extension Loft or dormer +1
    Domestic

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications