Planning application
Maisonette First And Second Floors 34 Cabul Road SW11 2PN
Works: Extension Loft or dormer Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of mansard roof extension to main rear roof slope including an increase in ridge height by 350mm (with French door and safety railing) and installation of 3 no. rooflights to front roof slope.
As published by the council, reference 2023/0510
Application record
- Reference
- 2023/0510
- Type
- Application for Full Permission
- Status
- FINAL DECISION
- Decision
- Approve with Conditions
- Received
- 8 Feb 2023
- Validated
- 20 Feb 2023
- Decided
- 5 Apr 2023
- Ward
- Falconbrook
- Decision by
- Delegated Standard
- Postcode
- SW11 2PN
Timeline
Dates from the published record
-
8 Feb 2023
Received by Wandsworth
-
20 Feb 2023
Validated
Checked as complete and ready for consideration.
-
5 Apr 2023
Decision issued: Approve with Conditions
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
45 Patience Road SW11 2PY
Alterations including erection of single storey rear and side extension.
Granted Householder Extension 9 docsSmall domestic -
19 Khyber Road SW11 2PZ
Alterations including erection of roof extension to main rear roof (with French doors and safety railings) including raising the ridge by 300mm; erection of single-storey rear side extension and two-storey rear extension.
Granted Householder Extension Windows or glazing 14 docsSmall domestic -
Land Adj to 579 Battersea Park Road SW11
Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit
Refused Full applications 14 docs -
Flat Ground Floor 5 Cabul Road SW11 2PR
Alterations including erection of a single storey rear and side extension.
Granted Full applications Extension 16 docsSmall domestic -
5 Cabul Road SW11 2PR
Alterations including erection of a single-storey ground floor extension and the formation of a terrace above rear extension with 1.7m high obscured glass balustrade for use by first floor flat.
Withdrawn Full applications Extension 15 docsSmall domestic -
The Asparagus Public House 1-13 Falcon Road SW11 2PL
Display of illuminated fascia signage and projecting sign.
Granted Advertising 6 docs
Other full applications applications
In Wandsworth
-
2026/3090 Awaiting decision
73 Bickersteth Road SW17 9SH
Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations
-
2026/3096 Awaiting decision
1 B Gorst Road London Wandsworth SW11 6JB
Replacement boundary walls/gates
-
2026/3087 Awaiting decision
30 Eversleigh Road SW11 5XA
Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.
-
2026/3095 Awaiting decision
Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY
Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.
-
2026/3094 Awaiting decision
64 Hillbury Road London Wandsworth SW17 8JT
Installation of four replacement windows