Skip to content
PlanIndex Get alerts
Menu

Planning application

169 Balham High Road SW12 9AU

Granted Wandsworth 2022/4516 Application for Full Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to existing shopfront and installation of awning.

As published by the council, reference 2022/4516

Application record

Reference
2022/4516
Type
Application for Full Permission
Status
FINAL DECISION
Decision
Approve with Conditions
Received
4 Nov 2022
Validated
30 Nov 2022
Decided
28 Apr 2023
Ward
Balham
Decision by
Delegated Standard
Postcode
SW12 9AU

Timeline

Dates from the published record

  1. 4 Nov 2022

    Received by Wandsworth

  2. 30 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2023

    Decision issued: Approve with Conditions

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 169 Balham High Road SW12 9AU

    2022/4692 Submitted 4 Nov 2022 0m away

    Installation of externally illuminated fascia and projecting signs plus awning.

    Granted Advertising 10 docs
  • Adj to 194 Balham High Road SW12 9BP

    2025/4605 Submitted 19 Dec 2025 30m away

    Installation of a new 1.575 cubic meter kiosk.

    Refused Outline 3 docs
  • 159 Balham High Road SW12 9AU

    2025/3139 Submitted 8 Sep 2025 42m away

    Variation of Condition F (restriction of operating hours) pursuant to planning permission dated 26/06/1978 ref 78/S/442 (Conversion of shop into a Restaurant) to allow opening hours of 24 hours 7 days a week (Temporary Permission).

    Granted Amendments 8 docs
  • Bus Shelter Pavement Outside 159 Balham High Road SW12 9BL

    2026/0249 Submitted 20 Jan 2026 46m away

    Display of internally illuminated double-sided sequential advertisement in a bus shelter capable of static and dynamic content display with automatic rotation of images measuring 1.34m width x 2.1m height x 0.245m depth.

    Granted Advertising 8 docs
  • Steel House 177 Balham High Road SW12

    2011/5042 Submitted 14 Nov 2011 76m away

    Construction of two additional storeys and a part four/part six storey rear extension in connection with the change of use of the building to a hotel

    Withdrawn Full applications Extension 2 docs
  • Bus Shelter Pavement Outside 212 Balham High Road SW12 9BS

    2026/0602 Submitted 12 Feb 2026 76m away

    Display double sided internal illuminated sequential advertisement screens capable of static and dynamic content display with automatic rotation of images.

    Granted Advertising 6 docs

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications