Skip to content
PlanIndex Get alerts
Menu

Planning application

7 New Union Square SW11 7DN

Granted Wandsworth 2021/1123 Advertisements

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of two internally illuminated projecting signs (0.65 height, 0.65 width, 0.17 depth) at 3.38m above ground level, six branded awnings and one vinyl advertisement.

As published by the council, reference 2021/1123

Application record

Reference
2021/1123
Type
Advertisements
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approve with Conditions
Received
9 Mar 2021
Validated
1 Jun 2021
Decided
20 Jul 2021
Ward
Queenstown - Historic
Decision by
Delegated Standard
Postcode
SW11 7DN

Timeline

Dates from the published record

  1. 9 Mar 2021

    Received by Wandsworth

  2. 1 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2021

    Decision issued: Approve with Conditions

  4. 29 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Wandsworth granted permission on 20 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Plot A01 Embassy Gardens DHL Depot 1-12 Ponton Road and 51 Nine Elms Lane SW8 5DA

    2026/2140 Submitted 10 Jun 2026 50 yards away

    90% historically approved · decision due ~14 Aug

    Submission of details pursuant to condition 58 (materials) in respect of Plot A01 only of the Embassy Gardens development approved under planning permission ref. 2021/3489 dated 13/07/2023.

    Awaiting decision Full applications 3 docs
  • Embassy Gardens Development Site, Nine Elms Lane, SW8

    2013/2827 Submitted 31 May 2013 50 yards away

    Details of external materials for buildings on plots A10 and A11 pursuant to condition 58 of pp 2011/1815 dated 30th March 2012 for demolition of all existing buildings and construction of a mixed use redevelopment to provide residential, commercial, hotel, community and assembly and leisure uses and associated parking, energy centres and new public amenity space.

    Granted Full applications Demolition 5 docs
  • Land at Nine Elms bounded by Nine Elms Lane to the north, the U.S. Embassy to the east and Ponton Road to the south and west

    2025/3765 Submitted 20 Oct 2025 100 yards away

    100% historically approved · decision due ~19 Dec

    Matters relating to a S106 Agreement pursuant the Cultural Action Implementation Plan required under Schedule 3, Part 8, Paragraph 1 of the S106 Agreement dated 18th September 2025 associated with planning permission 2025/2541 (Application for variation of the S106 Legal Agreement dated 7th October 2024 associated with planning permission ref. 2021/4900 for a phased development to provide two hotel buildings (north building 11 storeys and south building 15 storeys) with ancillary facilities including restaurant use to south building, together with the provision of a basement, cycle parking, plant, public realm, landscaping, and other associated works).

    Awaiting decision Conditions 3 docs
  • Land at Nine Elms bounded by Nine Elms Lane to the north, the U.S. Embassy to the east and Ponton Road to the south and west

    2025/3767 Submitted 20 Oct 2025 100 yards away

    Matters relating to a S106 Agreement pursuant to the District Heating Network Statement required under Schedule 3, Part 6 of the S106 Agreement dated 18th September 2025 associated with planning permission 2025/2541 (Application for variation of the S106 Legal Agreement dated 7th October 2024 associated with planning permission ref. 2021/4900 for a phased development to provide two hotel buildings (north building 11 storeys and south building 15 storeys) with ancillary facilities including restaurant use to south building, together with the provision of a basement, cycle parking, plant, public realm, landscaping, and other associated works).

    Withdrawn Conditions 5 docs
  • Land at Nine Elms bounded by Nine Elms Lane to the north, the U.S. Embassy to the east and Ponton Road to the south and west

    2025/3420 Submitted 29 Sep 2025 100 yards away

    90% historically approved · decision due ~4 Dec

    Submission of details pursuant to the discharge of Condition 22 (Site levels) of planning permission ref. 2021/4900 dated 07/10/24 (Phased development to provide two hotel buildings (north building 11 storeys and south building 15 storeys) with ancillary facilities including restaurant use to south building (14th Floor). Plus basement, cycle parking, plant, public realm and other associated works).

    Awaiting decision Full applications 6 docs
  • Land at Nine Elms bounded by Nine Elms Lane to the north, the U.S. Embassy to the east and Ponton Road to the south and west

    2025/2975 Submitted 22 Aug 2025 100 yards away

    Application under Section 96A of the Town and County Planning Act (1990) (as amended) for 'Non-Material' Amendments to planning permission 2021/4900 dated 07/10/24. Amendments comprise: (i) alterations to the external façades; (ii) alterations to the floor to floor heights; (iii) reconfiguration of basement and ground floor layouts, including increase in the size of the ancillary café, alterations to the refuse and cycle stores, and reorientation of the service yard lifts; (iv) removal of mezzanine level; (v) reconfiguration to layout, size and typology of hotel rooms on upper floors; and (vi) increase in number of bedrooms in the south hotel from 477 to 488.

    Granted Amendments 28 docs

In Wandsworth

  • 2026/3255 Awaiting decision

    Development Site Of Market Tower 1 Nine Elms Lane London Wandsworth SW8 5NQ

    Please see Application Documents and Application Drawings, prepared by Endpoint.

    Received 11 Sep, published by the council 21 Sep 2026 Advertising
  • 2026/1403 Granted

    38-44 St Johns Road SW11 1PW

    Display of internally illuminated wall mounted lettering sign and projecting sign and window mounted vinyl signage.

    Received 14 Apr, published by the council 29 Jul 2026 Advertising
  • 2025/4411 Granted

    Ground Floor 36 Trinity Road SW17 7RE

    Display of 2 x non illuminated fascia signs, and 1 x vinyl graphic to glazing.

    Received 8 Dec, published by the council 29 Jul 2026 Advertising
  • 2026/3190 Awaiting decision

    Corner of Battersea Park Road and Pump House Lane Battersea Power Station SW8 5BP

    Temporary, non-illuminated static advertisement panel measuring 14m wide x 5.5 height x 0.5 depth mounted to the outward-facing elevation of temporary site accommodation located at the corner of Battersea Park Road and Pump House Lane.

    Received 7 Sep, published by the council 10 Sep 2026 Advertising
  • 2026/0037 Granted

    82 Wandsworth High Street SW18 4LB

    Installation of external lighting to illuminate existing hand-painted mural on the flank wall.

    Received 5 Jan, published by the council 29 Jul 2026 Advertising