Skip to content
PlanIndex Get alerts
Menu

Planning application

Battersea Northern Line extension, Nine Elms Lane SW8 and Battersea Park Road

Granted Wandsworth 2020/5017 Details (following full perm.)

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details pursuant to parts e) and i) of condition 13 (ground-borne noise) of the deemed planning permission for the London Underground Northern Line Extension ref. TWA 3/1/415 dated 12/11/2014 ("A Transport and Works Act Order which authorises London Underground Limited ("LUL") to construct and operate a 3.2 kilometre extension of the Charing Cross Branch of the Northern Line from Kennington to a new station at the site of the disused Battersea Power Station, with an intermediate station at Nine Elms. The scheme (referred to as "the NLE") includes permanent ventilation shafts and head-houses at Kennington Park and Kennington Green and four new cross-passages at Kennington station. The Order also authorises the compulsory acquisition and temporary use of land for the purposes of the NLE.")

As published by the council, reference 2020/5017

Application record

Reference
2020/5017
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
22 Dec 2020
Validated
6 Jan 2021
Decided
17 Sep 2021
Ward
Queenstown - Historic
Decision by
Delegated Standard
Postcode
SE1 7TW

Timeline

Dates from the published record

  1. 22 Dec 2020

    Received by Wandsworth

  2. 6 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2021

    Decision issued: Approve No Conditions

  4. 10 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Wandsworth granted permission on 17 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Wandsworth

  • 2026/3232 Awaiting decision

    8 Henderson Road SW18 3RR

    CONVERSION OF 3 FLATS TO A SINGLE FAMILY DWELLING HOUSE WITH SINGLE STOREY GROUND FLOOR REAR EXTENSION WITH EXCAVATION OF BASEMENT BELOW WITH LIGHTWELL & ALTERATIONS TO FENESTRATION OF EXISTING FIRST FLOOR REAR ADDITION

    9 Sep 2026 Full applications
  • 2026/3229 Awaiting decision

    73 Massingberd Way SW17 6AF

    Householder planning permission for a loft extension, including new Velux windows to the front roof slope and a new terrace to the rear.

    9 Sep 2026 Full applications
  • 2026/3230 Awaiting decision

    160 Flat 1 West Hill SW15 3SR

    Dropped Kerb (Residential Crossover) and Front Garden Vehicle Hardstanding

    9 Sep 2026 Full applications
  • 2026/3214 Awaiting decision

    136-138 Flat Above Shop 136 St Johns Hill SW11 1SL

    Erection of a single storey ground floor extension and installation of a new front access door; together with the sub-division of larger unit into a single class E unit at no.136 St Johns Hill.

    8 Sep 2026 Full applications
  • 2026/3217 Awaiting decision

    220 Balvernie Grove SW18 5RW

    Alterations including erection of mansard roof extension to main rear roof slope and extension above two-storey rear outrigger

    8 Sep 2026 Full applications