Skip to content
PlanIndex Get alerts
Menu

Planning application

50 Chartfield Avenue SW15 6HG

Granted Wandsworth 2019/4660 Details (following full perm.)

Works: Loft or dormer Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of boundary treatment, CO2 emissions and water use pursuant to conditions 2, 16 and 17 of planning permission dated 23/12/2015 ref 2015/5987 (Demolition of existing residential dwelling and the erection of two-storey dwellinghouse including basement and habitable roofspace.)

As published by the council, reference 2019/4660

Application record

Reference
2019/4660
Type
Details (following full perm.)
Status
FINAL DECISION
Decision
Approve No Conditions
Received
28 Oct 2019
Validated
15 Nov 2019
Decided
22 Nov 2019
Ward
West Putney - Historic
Decision by
Delegated Standard
Postcode
SW15 6HG

Timeline

Dates from the published record

  1. 28 Oct 2019

    Received by Wandsworth

  2. 15 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 22 Nov 2019

    Decision issued: Approve No Conditions

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 45 Chartfield Avenue SW15 6HP

    2023/1327 Submitted 4 Apr 2023 45m away

    Rear Garden - Back Boundary T1 - Apple Reduce to historic points retaining furnishing growth. Reasons: T1 ??? Apple ??? The tree is located in the rear garden to the rear boundary ??? Reduction back to historic points by a reduction of approximately 1.5 ??? 1.8m of the branch length ??? Reduction works are part of a maintenance program to maintain the tree at a suitable and more desirable size for its location ??? To allow more suitable light levels in to the area T2 ??? Snake Bark Maple ??? The tree is located in the rear garden to the rear boundary ??? Reduction back to previous points by a reduction of approximately 1.8m of the branch length ??? Reduction works are part of a maintenance program to maintain the tree at a suitable and more desirable size for its location ??? To reduce the risk of secondary growth failure from previous pruning ??? To reduce the encroachment over the neighbouring property T3 ??? Eucalyptus Stump ??? The tree is located in the rear garden to the rear boundary ??? Reduction of the basal stems from a previously felled tree are part of a maintenance program to maintain the tree at a suitable size for its location ??? Reduction by approximately 1 ??? 1.5m of the branch length T5 ??? Oak ??? The tree is located in the rear garden to the left hand side ??? Reduction back to historic points by a reduction of approximately 1.5 ??? 1.8m of the branch length ??? To reduce the extent of the encroachment over the adjacent public footpath ??? To allow more suitable light levels in to the area T6 ??? Birch ??? The tree is located in the rear garden to the left hand side ??? Reduction works are part of a maintenance program to maintain the tree at a suitable and more desirable size for its location ??? To reduce the sail effect of the upper crown T2 - Snakebark Maple Reduce to previous points retaining furnishing growth. T3 - Eucalyptis Stump Reduce basal stems to previous points. Rear Garden - Left hand side T4 - Yew Trim round to tidy. T5 - Oak Re

    Withdrawn Trees 3 docs
  • 39 Chartfield Avenue SW15 6HP

    2024/3326 Submitted 10 Sep 2024 52m away

    G1 Mixed group This tree group consists of various small trees and shrubs on the eight-hand boundary. - Remove x2 small Conifers. - Remove x1 larger Leyland Cypress. - Reduce the height of the other items in this group to approx. 2 - 2.5m above ground level. - Trim the sides by as much as possible. T1 Silver Birch - Reduce all aspects of the crown by approx. 2.5 - 3m. - Lift the low hanging branches to approx. 3.5m above ground level. T2 Leyland Cypress - Fell tree in sections to ground level and grind stump to approx. 300mm below ground level. T3 Apple - Remove dead branches. - Reduce the crown by approx. 2m to create a tight and tidy shape. The aim here is to encourage some more internal growth in the lower crown. T4 Wild Cherry - Reduce all aspects of the crown by approx. 2m. T5 Laurel - Fell to ground level and grind stumps to approx. 300mm below ground level. T6 Pittosporum - Remove snapped limb. - Reduce the height by approx. 2m to prevent future branch failure. T7 Cypress - Fell to ground level and grind stump to approx. 300 below ground level. T8 Holly (side passage) - Fell to ground level and grind stump to 300 below ground level. This tree is very close to the house and the roots are interfering with the drains. T9 Holly x2 (front) - Reduce the height to approx. 3m above ground level and reduce over the drive and by the house. - Remove Grape Vine to ground level that is growing through the Holly trees and Magnolia. T11 Magnolia - Reduce the overhanging section by approx. 2m so it no longer overhangs the driveway so much. - Remove Vine as specified in T9 + T10.

    Decided Trees 1 doc
  • 39 Chartfield Avenue SW15 6HP

    2024/3107 Submitted 10 Sep 2024 52m away

    TPO 190/1998 T177 (T12 on application) Magnolia (neighbours tree - No.41) - Reduce the overhanging branches by approx. 1.5m back towards the boundary line. T179 (T10 on application) Holly x2 (front) - Reduce the height to approx. 3m above ground level and reduce over the drive and by the house. - Remove Grape Vine to ground level that is growing through the Holly trees

    Granted Trees 17 docs
  • Garages Rear Of 1 Solna Avenue SW15 6XF

    2026/0419 Submitted 2 Feb 2026 59m away

    Erection of 2 x 3-bedroom environmental and adaptable lifetime houses

    Withdrawn Full applications
  • 49 Chartfield Avenue SW15 6HW

    2020/0405 Submitted 27 Jan 2020 68m away

    Front Garden: T1 Magnolia spp - Crown reduce crown by 0.5m; selectively thin crown to allow more light into the front of the property. (Delicate pruning required to maintain the current shape) Rear Garden: T5 Cypress - Crown reduce by up to 3m. reducing crown height by 3m metres and trimming sides to form a tight and tidy crown.

    Withdrawn Trees 3 docs
  • 45 Larpent Avenue SW15 6UU

    2026/1230 Submitted 30 Mar 2026 70m away

    Replacement of garage door with new windows in connection with the conversion into habitable accommodation.Erection of proposed pitched roof including mezzanine level to the existing garage.

    Refused Householder Windows or glazing 7 docs
    Domestic

In Wandsworth

  • 2026/3090 Awaiting decision

    73 Bickersteth Road SW17 9SH

    Change of Use from a Dwellinghouse (Use Class C3) to a Seven-Bedroom House in Multiple Occupation (Sui Generis) with Rear Dormer Loft Extension, Second Floor Rear Outrigger Extension and Associated Alterations

    27 Aug 2026 Full applications
  • 2026/3096 Awaiting decision

    1 B Gorst Road London Wandsworth SW11 6JB

    Replacement boundary walls/gates

    27 Aug 2026 Full applications
  • 2026/3087 Awaiting decision

    30 Eversleigh Road SW11 5XA

    Rebuilding rear return ground floor infill extension, 1st floor rear return extension and 2nd floor loft conversion with front rooflights and rear dormers.

    27 Aug 2026 Full applications
  • 2026/3095 Awaiting decision

    Unit 5 Battersea Business Park 102-104 Stewart's Rd London Nine Elms SW8 4UY

    Installation of two HVAC units within a secure surround on a new concrete plinth, to the rear of the commercial warehouse and associated mechanical connection works at 5 Stewarts Road.

    27 Aug 2026 Full applications
  • 2026/3094 Awaiting decision

    64 Hillbury Road London Wandsworth SW17 8JT

    Installation of four replacement windows

    27 Aug 2026 Full applications