Skip to content
PlanIndex Get alerts
Menu

Planning application

261530

8 Rectory Road, Walthamstow, London, E17 3BQ

Status unknown Waltham Forest Householder Planning

Proposal

Construction of dormer roof extension to main rear roof, and roof extension above two storey outrigger, with installation of three roof lights to front roof slope. Together with raising of the ridge height.

As published by the council, reference 261530

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by Waltham Forest

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

Checking the current position

The process from here

The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.

The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • 261476 Status unknown

    8 Howard Road, Walthamstow, London, E17 4SJ

    Lawful Development Certificate (Proposed) - Construction of mansard roof extension to main rear roof, and roof extension above two storey outrigger, with installation of two roof lights to front roof slope.

    15 Jun 2026 101m away Lawful development
  • 070453 Granted

    44 Howard Road, Walthamstow, London, E17 4SJ

    Conversion of two flats into one house as shown on drawing no 457-01 received on 25 April 2007.

    25 Apr 2007 101m away Full applications
  • 070514 Granted

    41 Howard Road,

    Conversion of dwellinghouse into 2 self-contained flats (2x2 bed) as shown on drawing number FR 01b received on 16 April 2007.

    24 Apr 2007 126m away Full applications
  • 261466 Status unknown

    CHURCH HILL NURSERY SCHOOL, 47 Woodbury Road, Walthamstow, London, E17 9SB

    T15 & T16 - Crown lift. T10-T17 & T20 - Potential root pruning.

    15 Jun 2026 225m away Trees
  • 261480 Status unknown

    37 Falmer Road, Walthamstow, London, E17 3BH

    Construction of a single storey rear extension.

    16 Jun 2026 245m away Householder
  • 071252 Granted

    86 Byron Road, Walthamstow, London, E17 4SW

    Erection of house (one bedroom) as shown on unnumbered site location plan received on 20 April 2007 and drawing no 61292-02D received on 11September 2007.

    20 Apr 2007 293m away Full applications

In Waltham Forest

  • 261616 Status unknown

    9 Fulready Road, Leyton, London, E10 6DT

    Construction of single storey rear extension.

    1 Jul 2026 Householder
  • 261621 Status unknown

    116 Maynard Road, Walthamstow, London, E17 9JF

    Construction of a single storey side return extension.

    1 Jul 2026 Householder
  • 261606 Status unknown

    36 Holly Crescent, Woodford Green, IG8 9PD

    Construction of a two storey side extension together with the installation of two roof-lights , a single storey ground floor rear extension and rear dormer roof extension.

    29 Jun 2026 Householder
  • 261583 Status unknown

    6 Barclay Road, Leytonstone, London, E11 3DG

    Construction of a single storey side extension.

    26 Jun 2026 Householder
  • 261584 Status unknown

    6 Barclay Road, Leytonstone, London, E11 3DG

    Construction of a single storey rear infill extension together with associated landscaping and remedial works.

    26 Jun 2026 Householder