Planning application
261368
CENTRAL HOUSE, 189 - 203 Hoe Street, E17 3SZ
Proposal
Removal of the existing BT phone box and installation of a global street hub.
As published by the council, reference 261368
Timeline
Dates from the published record
-
1 Jun 2026
Received by Waltham Forest
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
Checking the current position
The process from here
The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.
The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
261331 Status unknown
CENTRAL HOUSE, 189 - 203 Hoe Street, E17 3SZ
Installation of a proposed global street hub with associated advertising screens on both sides of the unit.
-
261271 Status unknown
151 - 153 Hoe Street, Walthamstow, London, E17 3AL
Submission of details pursuant to condition 8 (cycle storage), condition 12 (materials) and condition 13 (means of enclosure) attached to planning permission reference 213443, granted 08/12/2023.
-
070099 Refused
228 High Street Walthamstow London E17 7JH
Change of use from retail (Use Class A1) to restaurant/takeaway (use Classes A3/A5) involving the installation of extract ventilation system to flank elevation, as shown on 1:1250 site plan and drawings 07/01, 07/02, 07/03, and 07/04 received on 13 April 2007.
-
070290 Granted
Amenia Cottage 41 West Avenue Walthamstow London E17 9QW
Demolition of existing building and the construction of 14 new flats as shown on revised drawing No. 267-03 received on 12 June 2007 and revised drawing Nos. 267-01b and 267-02b received on 11 July 2007.
-
070277 Refused
1 Second Avenue Walthamstow London E17 9QH
Formation of rooms in the roof, involving the installation of rear dormer, extending over back addition as shown on drawing nos WA-117-PL01 and BR03 received on 27 April 2007.
-
070083 Granted
14 Cedars Avenue,
Conversion of dwellinghouse into three self-contained flats (3x1 bed) as shown on 1:1250 site plan and drawings PP/01 and PP/02 received on 17 April 2007.
Other full applications applications
In Waltham Forest
-
261603 Status unknown
544 High Road Leytonstone, Leytonstone, London, E11 3DH
Construction of first-floor rear extensions to the upper floor flats at 544 and 546 High Road, Leytonstone, including the creation of roof-top amenity space.
-
261582 Status unknown
CARE HOME, 21 Ravenswood Road, Walthamstow, London, E17 9LY
Replacement of existing timber framed windows, rear exit doors and patio door/window with uPVC double-glazed casement windows and uPVC doors.
-
261558 Status unknown
1 Ranelagh Road, Leytonstone, London, E11 3JW
Demolition of garage and construction of a three storey, three bedroom dwellinghouse (Use Class C3) with associated refuse and recycling storage, landscaping and all other associated works.
-
261541 Status unknown
17 Evelyn Road, Walthamstow, London, E17 9HE
Replacement of existing double glazed uPVC framed front and rear casement windows with new double glazed uPVC framed front and rear casement windows. Replacement of existing double glazed timber framed front and rear communal doors with new double glazed steel framed front and rear communal doors.
-
261537 Status unknown
287 Brettenham Road, Walthamstow, London, E17 5AT
Replacement of two uPVC windows to the front with double-glazed timber sash windows and replacement of uPVC front door together with removal of external render to the front, rear and side at ground-floor level; exposed brickwork repainted. External works including Partial blocking up of existing kitchen door opening in reclaimed London stock brick to match; adjacent window opening adjusted to form a new aluminium-framed double-glazed door to the side return. Replacement of remaining uPVC windows and door to the rear and side with aluminium-framed double-glazed units. Construction of outbuilding within rear garden.