Planning applications in Wakefield, August 2025
Wakefield recorded 15 planning applications in August 2025, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, August 2025
Newest first
-
23/02103/SUB01 Awaiting decision
12 - 14 Ropergate Pontefract WF8 1JY
Discharge of conditions 3 (Materials) and 4 (Security) from approved application 23/02103/FUL
-
X4725/W/25/3368957 Granted
Ash Pits Hacking Lane South Elmsall West Yorkshire WF9 2SU
Appeal against the refusal of planning application 18/02310/FUL for 'Proposed Variation to Condition 2 (Timescale) to extend the period of extraction and restoration for an additional 10 years under Planning Permission Reference: 09/02426/FUL Excavation, screening, crushing and removal of ash from former brickworks quarry; import, screening and crushing of inert materials and soils; and restoration to meadow grassland; ponds and wetland and woodland granted on 8.6.2011.'
-
25/01638/FUL Awaiting decision
Land To The South Of South Elmsall Wakefield
Installation of underground electricity cables and associated works to connect a proposed ground mounted photovoltaic farm and battery energy storage development (located within Doncaster Metropolitan Borough Council, application ref: 25/01535/FULM) to the electricity grid network.
-
25/01609/ENFAPP Decided
Milton House 25 Milton Street Wakefield WF2 8TL
Removal of the three-storey rear extension & reinstatement of the roof to the condition before the works took place & remove all demolished materials from the land.
-
25/01587/FUL Awaiting decision
88A Pontefract Road Ferrybridge Knottingley WF11 8PS
Change of use from dwelling to a 2 bed HMO and external alterations.
-
25/01591/FUL Awaiting decision
Ryhill Liberal Club (Land To Rear Of) Wakefield WF4 2AL
Full planning application for the erection of 30 affordable dwellings (Use Class C3), internal highways, landscaping, open space and associated infrastructure and works
-
25/01565/FUL Awaiting decision
1 Red Hall Lane Wakefield WF1 2PU
Residential development (4 dwellings)
-
25/01562/FUL Awaiting decision
The Paddock The Spinney (Rear Of 24 The Russets) Sandal Wakefield WF2 6JF
Erection of 1no Dwelling (Resubmission of Application No 19/02082/FUL and 22/01694/FUL)
-
23/01375/SUB01 Awaiting decision
Birkwood Farm Birkwood Road Normanton WF6 2JE
Discharge of conditions 5 (Wharf Fenders), 6 (Wharf Design) ,7 (CEMP) and 8 (Wharf Fence) from approved application 23/01375/FUL.
-
25/01546/FUL Granted
25 Carlyle Road Castleford WF10 3BA
Replacement three bed dwellinghouse and side extension. Proposed air source heat pump.
-
X4725/W/25/3368025 Granted
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB
Appeal against the non-determination of planning application 22/01460/FUL for 'Construction and operation of a temporary battery energy storage system, formation of an access road, SuDS pond, landscape and ecological enhancements and associated works'
-
24/02090/SUB01 Awaiting decision
Pony Paddocks Whinney Lane Streethouse Pontefract WF7 6DD
Discharge of Condition 6 (Biodiversity Gains Plan), Condition 7 (Biodiversity Enhancement Plan), and Condition 8 (Drainage) from approved application 24/02090/FUL.
-
25/01518/ENFAPP Awaiting decision
Land North Of Post Office Road Featherstone Pontefract WF7 5EN
Alleged breach: Without planning permission, the material change of use of land from sport to storage and highway maintenance depot and the erection of a 2.5m high palisade and anti-climb fence.
-
24/01805/REM Granted
Land Off Downland Crescent Knottingley WF11 0EJ
Approval of reserved matters (Appearance, Landscaping & Scale) pursuant to outline permission 24/01805/OUT (dated. 17th January 2025) for 'Construction of 3no. houses with associated parking including access and layout'
-
25/01494/FUL Granted
4 Haguewood Court South Hiendley Barnsley Wakefield S72 9FP
Detached garage to rear
Other months in 2025
- January 2025 6
- February 2025 11
- March 2025 14
- April 2025 13
- May 2025 12
- June 2025 20
- July 2025 22
- August 2025 15
- September 2025 13
- October 2025 35
- November 2025 44
- December 2025 39