Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Walton Lane Wakefield WF2 6ES

Awaiting decision Wakefield 26/01382/FUL Full applications

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

First floor side extension above existing ground floor

As published by the council, reference 26/01382/FUL

Application record

Reference
26/01382/FUL
Category
Full applications
Status
Awaiting decision
Received
4 Aug 2026
Validated
4 Aug 2026
Ward
Wakefield South
Parish
South Wakefield
Postcode
WF2 6ES

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Wakefield

  2. 11 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wakefield took a median of 97 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Wakefield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 - 2 Sandal Hall Mews Wakefield WF2 6ED

    26/01241/TPO Submitted 10 Jul 2026 72m away

    48% historically approved · decision due ~7 Sep

    Crown Lift x2 Trees to height of 2.3m above the footway and prune tree to give clearance around lamppost.

    Awaiting decision Trees 2 docs
  • 4 Beechfield Wakefield WF2 6AW

    13/02305/PDEV Submitted 6 Aug 2013 75m away

    Two storey extension to rear and first floor extension to rear, projecting 2.9m

    Decided Prior approval Extension
  • 1 Beechfield Sandal Wakefield WF2 6AW

    11/01634/FUL Submitted 12 Aug 2011 75m away

    Two storey extension to side including 2no. dormer windows (amendment to previously approved application 10/02499/FUL)

    Granted Full applications Extension Loft or dormer +1 7 docs
  • 1 Sandal Hall Mews Wakefield WF2 6ED

    24/01751/TPO Submitted 8 Oct 2024 165m away

    Fell 1 Ash Tree. Crown Lift, Crown Clean and Crown Thin 1 Oak Tree by 30%.

    Refused Trees 7 docs
  • 1 Wentworth Way Wakefield

    01/99/61419/B Submitted 8 May 2001 175m away

    Conservatory to rear (resubmission)

    Granted Full applications Extension
  • St Helens Church Barnsley Road Wakefield WF2 6EJ

    24/01823/TPO Submitted 21 Oct 2024 177m away

    T4 Horse Chestnut: Fell; T12 Ash: Remove branch over footpath; T13 Ash: Reduce lowest western limb by 3m; T14 Beech: Fell leaving a 4m habitat stem and replace with a 10-12cm Fagus sylvatica f. purpurea (Purple Beech).

    Split decision Trees 8 docs

In Wakefield

  • 26/01595/FUL Awaiting decision

    9 Dovecote Lane Horbury Wakefield WF4 6BG

    Demolition of existing conservatory, replaced with single storey extension.

    3 Sep 2026 Full applications
  • 25/00865/FUL Granted

    Land South Of Mayfields Way And Parkgate, South Kirkby (HS45)

    Detailed planning application for residential dwellings (up to 104 dwellings) (Use Class C3) with communal public space, associated landscaping, and infrastructure works at Land at Mayfields Way, South Kirkby.

    2 May 2025 Full applications
  • 26/01563/FUL Awaiting decision

    132 Pontefract Road Ackworth Pontefract WF7 7EE

    Partial take down of boundary wall to form new pedestrian access, installation of a new gate and works to include repair, consolidation and repointing of walling.

    28 Aug 2026 Full applications
  • 26/01569/FUL Awaiting decision

    46 Manorfields Avenue Crofton Wakefield WF4 1SZ

    Single storey extension to side and rear

    28 Aug 2026 Full applications
  • 25/02164/FUL Refused

    Alcudia Woolley Low Moor Lane Woolley Wakefield WF4 2LN

    Change of use from agricultural/ residential to mixed use (aggregate distribution/ residential) including retention of physio room for personal use, construction of push walls, provision of office building and provision of ameliorative landscaping scheme (retrospective)

    19 Nov 2025 Full applications