15 Ledgard Drive Durkar Wakefield WF4 3BT

Granted Wakefield 26/00699/FUL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing garage for single storey extension to side and rear

As published by the council, reference 26/00699/FUL

Application record

Reference
26/00699/FUL
Type
Full Application
Status
Decided
Decision
Application Approved
Received
24 Apr 2026
Validated
24 Apr 2026
Decided
15 Jun 2026
Ward
Wakefield Rural
Parish
Crigglestone
Decision by
Delegated Decision
Postcode
WF4 3BT

Timeline

Dates from the published record

  1. 24 Apr 2026

    Received by Wakefield

  2. 15 Jun 2026

    Decision issued: Application Approved

  3. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Buildingcontrol: 26/00847/DEXBN (Building Work Started)

Who's behind it

Company information only, from the register and Companies House

Fox Architecture & Design Agent, an architecture practice

10 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • APPLICATIONFORMREDACTED Application Form · 24 Apr 2026
  • EXISTING SITE LOCATION AND LAYOUT Drawing · 24 Apr 2026
  • EXISTING ELEVATIONS Drawing · 24 Apr 2026
  • EXISTING LAYOUT Drawing · 24 Apr 2026
  • PROPOSED SITE LOCATION AND LAYOUT Drawing · 24 Apr 2026
  • PROPOSED ELEVATIONS Drawing · 24 Apr 2026
  • PROPOSED LAYOUT Drawing · 24 Apr 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Wakefield granted permission on 15 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 11 Ledgard Drive Durkar

    01/99/54194/E Submitted 30 Jan 2001 39m away

    First floor extension to side

    Granted Full applications Extension
  • 11 Ledgard Drive Durkar

    00/99/54194/B Submitted 8 Mar 2000 39m away

    Single storey extension to side

    Granted Full applications Extension
    Small domestic
  • 7 Lee Crescent Durkar Wakefield

    01/99/21919/C Submitted 28 Mar 2001 57m away

    Conservatory to rear

    Granted Full applications Extension
  • 3 Lee Crescent Durkar Wakefield WF4 3BU

    13/01861/FUL Submitted 24 Jun 2013 57m away

    Two storey side extension and single storey extension to rear

    Granted Full applications Extension 4 docs
    Small domestic
  • 6 Eastwood Close Durkar

    03/99/44808/C Submitted 18 Feb 2003 92m away

    Replacement conservatory

    Granted Full applications Extension
  • 8 The Crimbles Durkar

    01/99/61458 Submitted 14 Feb 2001 142m away

    Crown thinning, crown cleaning and crown raising of 1 No Lime

    Granted Trees

In Wakefield

  • 26/00224/FUL Decided

    4A Station Road Ryhill Wakefield WF4 2DT

    Retrospective planning permission for the demolition of existing dwellinghouse and changes to ground levels, construction of self-build dwellinghouse with associated works.

    9 Feb 2026 Full applications
  • 26/01293/FUL Decided

    57 Silcoates Street Wakefield WF2 0EA

    Single storey extension to rear

    20 Jul 2026 Full applications
  • 26/01331/FUL Decided

    18 Victoria Avenue Wakefield WF2 9QL

    Single storey extension to front and side.

    27 Jul 2026 Full applications
  • 26/01682/FUL Awaiting decision

    Unit 40 Monckton Road Industrial Estate Monckton Road Wakefield WF2 7AL

    Construction of a car park to provide 20 parking spaces (previously approved under application reference 19/00966/FUL)

    15 Sep 2026 Full applications
  • 26/01238/FUL Decided

    108 Manor Road Ossett Wakefield WF5 0LW

    Part single, part two storey extension to rear

    9 Jul 2026 Full applications