Planning application
Strickland Court Plot 1, South Kirby Business Park Avenue Lodeve South Kirkby Pontefract
Works: Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of conditions 4. CEMP, 5 Foul and Surface Water Drainage, 6 Drainage (Temporary), 7 Flood Route Drawing, 8 Gas protection measures, 9 BNG, 10 HMMP, 11 BNG CEMP, 12 Wildlife Enhancements, 13 BNG Lighting Strategy, 14 Landscaping, 15 Security, 22 External Materials, 23 Tree Protection from approved application 24/01622/FUL
As published by the council, reference 24/01622/SUB01
Application record
- Reference
- 24/01622/SUB01
- Type
- Discharge of Conditions Request
- Status
- Awaiting decision
- Received
- 5 May 2026
- Validated
- 5 May 2026
- Ward
- South Elmsall And South Kirkby
- Parish
- South Kirkby
Timeline
Dates from the published record
-
5 May 2026
Received by Wakefield
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wakefield took a median of 63 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 24/01622/FUL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
85 documents on file for this application
- GAS PROTECTION MEASURES - REMEDIATION & VALIDATION STRATEGY
- BIODIVERSITY NET GAIN
- SITE PLAN - GENERAL ARRANGEMENT
- BIODIVERSITY ENHANCEMENT PLAN
- HABITAT MANAGEMENT & MONITORING PLAN
- BIODIVERSITY GAIN PLAN
- LAND QUALITY WAKEFIELD COUNCIL
- WAKEFIELD COUNCIL ECOLOGIST
- WAKEFIELD COUNCIL DRAINAGE
- WYPLO
- WEST YORKSHIRE POLICE
- WEST YORKSHIRE POLICE
- WEST YORSHIRE POLICE
- CCTV SITE PLAN
- WEST YORKSHIRE POLICE DOCO
- EXTERNAL LIGHTING DRAWING.
- BAT ANDBIRD BOXES
- PLANTING SCHEME
- PLANTING SCHEME
- PLANTING SCHEME
- PLANTING SCHEME
- BIODIVERSITY GAINS PLAN
- HMMPT
- WILDLIDFE ENHANCEMENTS CONDITION 12
- LIGHTING PLAN CONDTION 13
- WILDLIFE
- LIGHTING
- HABITAT MONITORING
- BIODIVERSITY GAINS PLAN
- WAKEFIELD COUNCIL ECOLOGIST
- FLOW CALS.
- FLOOD ROUTING PLAN
- TEMPORARY DRAINAGE DESIGN
- RADON GAS PAGE 3
- RESPONSE TO PLANNING CONSULTEES - CONDITION 8 - GAS PROTECTION MEASURES
- RESPONSE TO PLANNING CONSULTEES - CONDITION 15 - SECURITY
- FLOW CALCULATIONS
- FLOOD ROUTING PLAN
- COMBINED TEMPORARY & PERMANENT DRAINAGE ARRANGEMENT
- PHASE 1 & 2 GEO-ENVIRONMENTAL RISK ASSESSMENT - EXECUTIVE SUMMARY
- YORKSHIRE WATER
- WEST YORKSHIRE POLICE DOCO
- WAKEFIELD COUNCIL DRAINAGE
- LAND QUALITY WAKEFIELD COUNCIL
- HIGHWAYS DEVELOPMENT MANAGEMENT WAKEFIELD COUNCIL
- THE COAL AUTHORITY
- APPLICATIONFORMREDACTED
- CONSTRUCTION METHOD PLAN
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- DISCHARGE OF CONDITION APPLICATION - LARGE SUPPORTING DOCUMENTS WILL BE ISSUED S
- DRAINAGE STRATEGY REPORT
- DRAINAGE MAINTENANCE & MANAGEMENT PLAN
- STORMBRAKE PERFORMANCE REPORT
- TYPICAL DRAINAGE DETAILS
- SURFACE WATER DRAINAGE ASSESSMENT & STRATEGY REPORT
- EXTERNAL WORKS SECTIONS
- DRAINAGE STRATEGY REPORT
- IMPERMEABLE AREAS
- ON SITE ATTENUATION
- STORMBRAKE PERFORMANCE REPORT
- EXISTING SW MICRODRAINAGE ANALYSIS
- SOUTH KIRKBY, AVENUE LODEVE/DARKSIDE DEVELOPMENTS
- TEMPORARY SURFACE WATER STRATEGY
- TEMPORARY SURFACE WATER DRAINAGE DESIGN
- FLOOD RISK ASSESSMENT
- TECHNICAL NOTE - FLOOD EXCEEDANCE PLAN EXEMPTION
- PHASE 1 & 2 GEO-ENVIRONMENTAL RISK ASSESSMENT
- HABITAT MANAGEMENT & MONITORING PLAN
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- PLANTING PLAN, SCHEDULE & SPECIFICATION NOTES
- LIGHTING DESIGN STRATEGY FOR BIODIVERSITY - CONDITION 13 DISCHARGE SUBMISSION
- LIGHTING DESIGN STRATEGY FOR BIODIVERSITY - CONDITION 13 DISCHARGE SUBMISSION
- PLANTING PLAN, SCHEDULE & SPECIFICATION NOTES
- PLANTING PLAN - SHEET 1
- PLANTING PLAN - SHEET 1
- PLANTING PLAN - SHEET 1
- SAFETY & SECURITY MEASURES SCHEME - DISCHARGE CONDITION 15
- SAFETY & SECURITY MEASURES SCHEME - DISCHARGE CONDITION 15
- PROPOSED BOUNDARY TREATMENT PLAN
- MATERIAL SCHEDULE
- MATERIAL SCHEDULE
- ARBORICULTURAL IMPACT ASSESSMENT & METHOD STATEMENT
- TREE SURVEY SCHEDULE
- TREE PROTECTION PLAN
- PRELIMINARY TREE CONSTRAINTS PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Wakefield for determination, against a statutory target of eight weeks. Over the last year Wakefield decided condition discharge and variation applications in a median of 102 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Hague Hall Farm Water Lane Hemsworth Pontefract WF9 4DH
91% historically approved · decision due ~8 Jul
Change of use of grazing land to an all-weather horse pen Remove the wet top soil, install drains and lay a woven geotextile membrane throughout the base then a layer of clean recycled stone topped off with compacted road plainings. Then a suitable surface installed on top.
Awaiting decision Full applications 18 docs
Other condition discharge and variation applications
In Wakefield
-
25/00814/SUB01 Granted
The Lodge 475 Barnsley Road Newmillerdam Wakefield WF2 6BN
Discharge of Condition 3 (Materials), Condition 4 (Arboricultural Method Statement), Condition 5 (Chimney) from approved application 25/00814/FUL
-
23/00100/SUB21 Granted
Former Coal Yard, Ferrybridge 'C' Power Station Ferrybridge Kirkhaw Lane Knottingley
Application to Discharge Condition 18 (Biodiversity Retention Enhancement Scheme) for Phase 4 (S278 Highways Works) and Zone B of Planning Permission 23/00100/S7301
-
23/00100/SUB20 Granted
Former Coal Yard, Ferrybridge 'C' Power Station Ferrybridge Kirkhaw Lane Knottingley
Application to Discharge Condition 19 (Landscape and Ecological Management Plan) for works that relate the S278 (highway works) of Planning Permission 23/00100/S7301
-
23/02273/SUB01 Granted
Fir Tree Farm House Hall Lane North Elmsall Pontefract WF9 2DZ
Discharge of conditions 3 (Archaeology Written Statement of Investigation), 4 (Finished Floor Levels), 5 (Materials and Finishes), 6 (Foul and Surface Water Drainage), 7 (Radon Protection Measures) and 8 (Site Investigation and Remediation) from approved application 23/02273/FUL
-
24/00231/SUB26 Granted
Land Rear Of Park Balk Farm Womersley Road Knottingley WF11 0DQ
Discharge of condition 16 (Construction Management Plan) from approved application 24/00231/FUL.