Planning application
Normanton Industrial Estate Don Pedro Avenue Normanton WF6 1TD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of building for uses E(g)(iii), B2 & B8 and ancillary office space, access road, service yard, car parking, landscaping and substation.
As published by the council, reference 23/02159/FUL
Application record
- Reference
- 23/02159/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 9 Nov 2023
- Validated
- 23 Nov 2023
- Decided
- 15 Apr 2025
- Ward
- Normanton
- Parish
- Normanton
- Decision by
- Delegated Decision
- Postcode
- WF6 1TD
Timeline
Dates from the published record
-
9 Nov 2023
Received by Wakefield
-
23 Nov 2023
Validated
Checked as complete and ready for consideration.
-
15 Apr 2025
Decision issued: Application Approved
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Zerum Ltd Agent, registered in Manchester
Active · incorporated 2010 · Manchester
284 applications on PlanIndex · across 19 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordM62 CONNECT LIMITED Applicant, registered in Marlow
Active · incorporated 2022 · Marlow
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
38 documents on file for this application
- S106 AGREEMENT
- PROPOSED SITE BLOCK PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- WAKEFIELD COUNCIL PLANNING ECOLOGIST
- DRAINAGE TECHNICAL NOTE
- LAND QUALITY WAKEFIELD COUNCIL
- LAND QUALITY WAKEFIELD COUNCIL
- TRAVEL PLAN
- ROAD SAFETY AUDIT
- ENVIRONMENT AGENCY
- FINAL GAS RISK ASSESSMENT
- WAKEFIELD COUNCIL ENVIRONMENTAL CONTROL
- WAKEFIELD COUNCIL DRAINAGE
- RIVER CONDITION ASSESSMENT REPORT
- THE ENVIRONMENT AGENCY
- HIGHWAYS DEVELOPMENT MANAGEMENT WAKEFIELD COUNCIL
- WEST YORKSHIRE POLICE DOCO
- WAKEFIELD COUNCIL DRAINAGE
- HSE
- ENERGY STATEMENT
- MAMMAL SURVEY
- BIODIVERSITY NET GAIN
- DRAINAGE DESIGN SUDS TECHNICAL DOCUMENT
- PHASE II SITE APPRAISAL
- APPLICATIONFORMREDACTED
- BIODIVERSITY NET GAIN ASSESSMEN
- ENERGY STATEMENT
- FLOOD RISK ASSESSMENT
- TRANSPORT STATEMENT
- FRAMEWORK TRAVEL PLAN
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- PROPOSED ROOF PLAN
- SITE SECTIONS
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- PROPOSED FLOOR PLANS
- PROPOSED ELEVATIONS
- PLANNING STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Wakefield granted permission on 15 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Acxiom Corporation White Rose Technology Centre Don Pedro Avenue Normanton Wakefield WF6 1TD
Installation of 4 no. chillers and 2 no. tanks
Granted Full applications 4 docs -
Sheridan House Don Pedro Avenue Normanton WF6 1TD
Discharge of condition 3 (EV Charging/Parking Bays) from approved application 24/00554/FUL.
Granted Conditions 5 docs -
Sheridan House Don Pedro Avenue Normanton WF6 1TD
Retention of existing car park
Granted Full applications 13 docs -
44-48 Newlaithes Crescent Normanton WF6 1SY
Change of use of land to rear of no. 44, 46, 48 Newlaithes Crescent from grass verge to form residential garden and erection of 2.0m-high fence
Refused Full applications 3 docsSmall domestic -
Mildred Sylvester Way Normanton
Erection of one new workshop and associated office, HGV sales, service areas and car parking (sui generis) and erection of one Unit comprising Use Class E (g) (ii) and E (g) (iii), B2/B8 workspace and ancillary service areas and car parking.
Awaiting decision Full applications 58 docsDomestic -
7 Lakeside Court Normanton WF6 1WS
Conversion of existing garage to form a habitable room including infilling/ blocking up garage door and forming a new window opening.
Granted Lawful development Windows or glazing 9 docs
Other full applications
In Wakefield
-
26/01917/FUL Awaiting decision
179 Bradford Road Wakefield WF1 2AS
single storey rear & side extension.
-
26/01910/FUL Awaiting decision
St Thomas A Becket Catholic Secondary School Barnsley Road Wakefield WF2 6EQ
Redevelopment of St Thomas `a Becket Catholic Secondary School, including demolition of majority of existing buildings and construction of replacement part-two part-three storey building, as well as new and reconfigured parking and access arrangements, new and enhanced landscaping, reinstatement of hard outdoor PE space, SEND garden, installation of sub-station and switch room, and drainage works to existing playing fields.
-
26/01536/FUL Decided
10 Vickers Avenue South Elmsall Pontefract West Yorkshire WF9 2LN
Proposed two storey extension to side
-
26/01900/FUL Awaiting decision
30 Eskdale Road Wakefield WF2 9HF
Rear paved area (retrospective)
-
26/01906/FUL Awaiting decision
Theatre Royal And Opera House Drury Lane Wakefield WF1 2TE
Refurbishment of the theatre, including partial demolition, and the addition of a new second floor extension to the West Wing to provide new back-of-house facilities, an accessible entrance, a new accessible lift and stairs, and a new accessible scene dock. Demolition of existing ancillary spaces at the north end of the site and the addition of an enlarged rooftop plant space. External alterations include the addition of smoke vents to the existing roof, new smoke vents to the northern elevation and window replacements. Partial demolition of internal walls and floors, a new bar area, increased WC provision, a new dressing room, and a new studio. Alterations to the auditorium flooring rake, new seating, rearrangement of services and technical equipment, plaster repairs and redecoration of existing interior.