Planning application
Flat 1 Styles Court Newbury Street Wantage OX12 8DN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of CBT on wall
As published by the council, reference P26/V0178/T28
Application record
- Reference
- P26/V0178/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Telecommunications Development (28) - Approval Granted
- Received
- 20 Jan 2026
- Validated
- 20 Jan 2026
- Decided
- 4 Feb 2026
- Postcode
- OX12 8DN
Timeline
Dates from the published record
-
20 Jan 2026
Received by Vale of White Horse
-
4 Feb 2026
Decision issued: Telecommunications Development (28) - Approval Granted
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About telecoms applications
How this application type works
Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.
Nearby applications
Within 500 metres
-
Flat 1 Styles Court Newbury Street Wantage OX12 8DN
Installation of CBT on wall
Granted Telecoms 1 doc -
Stiles Court Newbury Street Wantage OX12 8DN
BT intends to install fixed line broadband electronic communications apparatus
Decided Telecoms 2 docs -
Footpath between 1 & 8 Stiles Court Newbury Street Wantage OX12 8DN
Repairs to existing listed footpath.
Granted Heritage and listed buildings 7 docs -
-
Winslow Hall Newbury Street WANTAGE OX12 8DJ
Proposed refurbishment and conversion of 2 existing dwellings into 3 dwellings.
Decided Full applications 10 docsSeveral homes -
STREET RECORD Portway Wantage Oxfordshire OX12 9BU
Prior approval application for open reach broadband cabinet located opposite 11 Portway, Wantage.
Decided Prior approval 7 docs
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.