Planning application
Uffington postcode area
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed installation of 4 (Four) 11 metre wooden poles to be installed with 9.3 metres above ground.
As published by the council, reference P23/V0044/T28
Application record
- Reference
- P23/V0044/T28
- Type
- Telecoms 28 day notification Part 16, Class A
- Status
- Decision Made
- Decision
- Telcoms Development (28) Granted
- Received
- 5 Jan 2023
- Validated
- 5 Jan 2023
- Decided
- 1 Feb 2023
- Decision by
- Delegated
Timeline
Dates from the published record
-
5 Jan 2023
Received by Vale of White Horse
-
1 Feb 2023
Decision issued: Telcoms Development (28) Granted
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Droitwich
6 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 1 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Greywethers High Street Uffington Faringdon Oxfordshire SN7 7RP
Non-material amendment to planning permission 11/00267/FUL, to reduce the size and shape of the windows to the south wall of the approved extension.
Decided Amendments Extension Windows or glazing 3 docs -
Domestic
-
Greywethers High Street Uffington Faringdon SN7 7RP
Discharge conditions 3 and 4 of planning permission P11/V0267.
Decided Conditions 5 docs -
Cuckoos Cottage High Street Uffington Faringdon SN7 7RP
Construction of new first floor window.
Decided Householder Windows or glazing 7 docsDomestic -
Greywethers High Street Uffington Faringdon SN7 7RP
Proposed erection of a garage with office in roof space.
Refused Householder 7 docsDomestic -
Brook Cottage High Street Uffington Faringdon SN7 7RP
Proposed erection of a garden room and ground floor wc/shower room.
Decided Householder 9 docsSmall domestic
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.