Planning application
O/S 29 Blacklands Way Abingdon OX14 1DY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Advance Notice of Intention to Install Telecommunications Apparatus - SMAI52
As published by the council, reference P17/V1825/T28
Application record
- Reference
- P17/V1825/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Telecommunications Development (28) - Approval Granted
- Received
- 27 Jun 2017
- Validated
- 27 Jun 2017
- Decided
- 13 Jul 2017
- Postcode
- OX14 1DY
Timeline
Dates from the published record
-
27 Jun 2017
Received by Vale of White Horse
-
13 Jul 2017
Decision issued: Telecommunications Development (28) - Approval Granted
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 13 July 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Foxcombe Court Wyndyke Furlong ABINGDON OX14 1DZ
Reserved Matters application following Outline Approval P16/V0962/O for access, appearance, landscaping, layout and scale.(as amended by drawings received 22 May 2017).
Granted Reserved matters 40 docsMajor scheme -
Foxcombe Court Wyndyke Furlong Abingdon OX14 1DZ
Proposed demolition of existing office building.
Granted Other Demolition 5 docs -
Unit F Windrush Court Abingdon Business Park Abingdon Oxon OX14 1SY
Proposed use of Suite F Windrush Court for B1 purposes.
Decided Lawful development 7 docs -
Unit F Windrush Court Abingdon Business Park Abingdon OX14 1DZ
Erection of new company name signage.
Granted Advertising 4 docs -
The Magna Building Wyndyke Furlong Abingdon OX14 1UJ
Installation of new windows to South and West elevations, alterations to the roof, pump station roof and utility station roof.
Decided Full applications Windows or glazing 8 docs -
Smeg UK Ltd The Magna Building Wyndyke Furlong Abingdon OX14 1DZ
To construct a new front entrance to the ground floor. To add a new set of rear fire escape doors to building To remove existing loading bay door and install a new set in a different location
Decided Full applications 8 docs
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.