Planning application
O/S 44 Joyces Road Stanford in the Vale SN7 8HT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a cabinet, box, pillar, pedestal or similar apparatus which does not exceed 1.8 metres in height or where the ground or base area does not exceed 1.5 square metres
As published by the council, reference P16/V1495/T28
Application record
- Reference
- P16/V1495/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Granted As published: Telecommunications Development (28) - Approval Granted
- Received
- 7 Jun 2016
- Validated
- 7 Jun 2016
- Decided
- 5 Jul 2016
- Postcode
- SN7 8HT
Timeline
Dates from the published record
-
7 Jun 2016
Received by Vale of White Horse
-
5 Jul 2016
Decision issued: Telecommunications Development (28) - Approval Granted
-
23 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 5 July 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Joyces Road O/S 2 Van Diemans Stanford in the Vale Faringdon SN7 8HN
Installation of one equipment cabinet.
Decided Telecoms 1 doc -
45 Joyces Road Stanford In The Vale SN7 8HT
Convert garage to habitable room. Extend porch and square off garden room. Re-roof single storey area of existing dwelling with new pitched roof.
Granted Householder Extension Roofing 11 docsSmall domestic -
41 Joyces Road Stanford In The Vale Faringdon Oxfordshire SN7 8HT
Erection of a single storey side extension
Granted Extension 6 docsSmall domestic -
White Horse Business Park Stanford In The Vale Faringdon SN7 8EY
Install telecommunication apparatus - meter cabinet within the existing fence line and new location for access gate
Granted Telecoms 6 docsSmall domestic -
2 Tyrell Close Stanford in the Vale FARINGDON SN7 8EY
First floor extension
Granted Householder Extension 7 docsDomestic -
23 Joyces Road Stanford in the Vale Faringdon SN7 8HT
Single storey extension and shed.
Granted Householder Extension 6 docsSmall domestic
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.