Planning application
Pusey Furze Wood Woods on side of A420 Buckland SN7 8PY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To install electronic communications apparatus/development ancillary to radio equipment housing.
As published by the council, reference P14/V1649/T28
Application record
- Reference
- P14/V1649/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Granted As published: Telecommunications Development (28) - Approval Granted
- Received
- 14 Jul 2014
- Validated
- 14 Jul 2014
- Decided
- 28 Jul 2014
- Postcode
- SN7 8PY
Timeline
Dates from the published record
-
14 Jul 2014
Received by Vale of White Horse
-
28 Jul 2014
Decision issued: Telecommunications Development (28) - Approval Granted
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 28 July 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
BT Exchange Unit A420 Nr Buckland SN7 8PY
Retrospective application for erection of fencing.
Refused Full applications 15 docs -
Mast at Pusey Furze Wood side of A420 Buckland SN7 8PY
Proposal to install electronic communications apparatus/development ancillary to radio equipment housing.
Granted Telecoms 1 doc -
Furze Barn Pusey Furze Barns Buckland Faringdon Oxfordshire SN7 8PY
Erection of oak framed sun room.
Granted 6 docs -
Pusey Furze House Buckland Faringdon Oxfordshire SN7 8PY
Installation of two conservation roof windows and internal work to install downstairs cloakroom.
Withdrawn Windows or glazing -
Pusey Furze House Buckland Faringdon Oxfordshire SN7 8PY
Installation of two conservation roof windows and internal work to install downstairs cloakroom.
Withdrawn Heritage and listed buildings Windows or glazing -
Pusey Furze House, Buckland, Faringdon, SN7 8PY
Relocation of hot-water tank from upstairs cupboard to spare room in loft space, replacement of crittall windows in the master bathroom and guest bathroom and Installation of a doorway to the landing.
Granted Heritage and listed buildings Windows or glazing 18 docs
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.