Planning application
Mast at Elms Farm Grove Road Grove OX12 7PD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposal to install electronic communications apparatus/development ancillary to radio equipment housing.
As published by the council, reference P14/V1605/T28
Application record
- Reference
- P14/V1605/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Telecommunications Development (28) - Approval Granted
- Received
- 10 Jul 2014
- Validated
- 10 Jul 2014
- Decided
- 1 Aug 2014
- Postcode
- OX12 7PD
Timeline
Dates from the published record
-
10 Jul 2014
Received by Vale of White Horse
-
1 Aug 2014
Decision issued: Telecommunications Development (28) - Approval Granted
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 1 August 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Elms Farm Grove Road Grove OX12 7PD
To install electronic communications apparatus/development ancillary to radio equipment housing.
Granted Telecoms 1 doc -
Elms Farm Grove Road Wantage OX12 7PD
Change of use of existing hardstanding from agricultural use to parking and storage.
Decided Full applications 6 docs -
Elms Farm Grove Road Grove OX12 7PD
Change of use of existing tractor shed from agricultural use to flexible use falling within Class B1 (business) or Class D8 (storage and distribution) of the Use Classes Order.
Decided Outline 5 docsSmall domestic -
Elms Farm Grove Road Wantage OX12 7PD
Change of use of existing land and laying of hardstanding for parking in connection with the existing B1, B2 and B8 uses at Elms Farm, Wantage.
Decided Full applications 6 docs -
Elms Farm Grove Road Grove Wantage OX12 7PD
Discharge conditions 4, 6, 7, and 8 of planning permission P12/V1510/FUL.
Decided Conditions 6 docs -
Elms Farm Grove Road Grove WANTAGE OX12 7PD
Change of use of land and laying of hardstanding for parking in connection with the existing B1, B2 and B8 uses at Elms Farm, Wantage
Decided Full applications 8 docs
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.