Planning application
Matthew Arnold School Arnolds Way Cumnor Hill OXFORD OX2 9JE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replace 3 no. antennas in-situ with 6 no. new antennas on the existing pole supports, additional kit within cabin and cable tray with development ancillary thereto.
As published by the council, reference P14/V1048/T28
Application record
- Reference
- P14/V1048/T28
- Type
- Other (Telecoms 28 day not.)
- Status
- Permitted
- Decision
- Granted As published: Telecommunications Development (28) - Approval Granted
- Received
- 8 May 2014
- Validated
- 8 May 2014
- Decided
- 30 May 2014
- Postcode
- OX2 9JE
Timeline
Dates from the published record
-
8 May 2014
Received by Vale of White Horse
-
30 May 2014
Decision issued: Telecommunications Development (28) - Approval Granted
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Vale of White Horse granted permission on 30 May 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
108089 & Matthew Arnold School Arnolds Way Cumnor Hill OXFORD OX2 9JE
Replacement of 6 No Antennas and ancillary development thereto.
Granted Telecoms 3 docs -
Matthew Arnold County Secondary School Arnolds Way Oxford OX2 9JE
Renewal of consent and continued use of a double relocatable classroom unit, ref T2 (PR11) for a further period of five years
Granted Outline 1 doc -
Matthew Arnold School, Arnolds Way, Cumnor Hill, Oxford, Oxfordshire, OX2 9JE
Removal of 3 No. antennas and installation of 3 No. replacement antennas and associated remove radio units on the existing tower. Ancillary development thereto.
Granted Telecoms 7 docs -
Matthew Arnold School Arnolds Way Oxford OX2 9JE
The removal of 3no. Antennas, with the replacement of 3no. Antennas. Internal cabinet equipment upgrade. Development ancillary reworks and steelworks thereto.
Granted Telecoms 3 docs -
17 Halls Close Cumnor Hill Oxford Oxfordshire OX2 9HR
Installation of three new rooflights in side elevation.
Withdrawn Loft or dormer 10 docs -
17 Halls Close Cumnor Hill Oxford Oxfordshire OX2 9HR
Proposed 2 new rooflights in side elevation.
Granted Loft or dormer 10 docs
Other telecoms applications
In Vale of White Horse
-
P26/V3710/16A(28) Granted
O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY
Installation of 1 x 11m medium wooden pole
-
P26/V3674/16A(28) Granted
OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA
Installation of 1x 9m Medium Wooden Pole
-
P26/V3673/16A(28) Granted
OS 25A Home Close Wootton Abingdon OX13 6DB
Installation of 1 x 9m Medium Wooden Pole
-
P26/V3594/16A(28) Granted
Land at Joinery Display Systems Park Road Faringdon SN7 7BP
The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.
-
P26/V3524/16A(28) Granted
Abingdon Fire Station Ock Street Abingdon OX14 5DH
The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.