Skip to content
PlanIndex Get alerts
Menu

Planning application

Site 22403 - Princes Manor Farm Cow Lane Harwell Oxfordshire OX11 0DN

Withdrawn Vale of White Horse P12/V2681/T28 Other (Telecoms 28 day not.)

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Notification under the electronic communication code

As published by the council, reference P12/V2681/T28

Application record

Reference
P12/V2681/T28
Type
Other (Telecoms 28 day not.)
Status
Withdrawn
Decision
Withdrawn prior to determination
Received
2 Jan 2013
Validated
2 Jan 2013
Decided
9 Jan 2013
Postcode
OX11 0DN

Timeline

Dates from the published record

  1. 2 Jan 2013

    Received by Vale of White Horse

  2. 9 Jan 2013

    Decision issued: Withdrawn prior to determination

  3. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Vale of White Horse decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About telecoms applications

Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Princess Manor Farm Kestrel Way Didcot OX11 6DU

    P26/V0495/T28 Submitted 25 Feb 2026 0m away

    The removal of the existing 12-metre-high CU Phosco Phase 3 Monopole and the installation of a new 19-metre-high CU Phosco Phase 6 Monopole with a new headframe. The removal of the existing 6 x antennas and the installation of 6 x new antennas and the development of ancillary equipment thereto.

    Granted Telecoms 2 docs
  • Princes Manor Farm Church Lane Harwell OX11 0HA

    P14/V1105/T28 Submitted 14 May 2014 24m away

    Upgrade existing telecommunications installation.

    Granted Telecoms 4 docs
  • Phase 6T - Infrastructure (RM2a), Land at Valley Park, Didcot

    P25/V0875/RM Submitted 16 Apr 2025 347m away

    Reserved Matters for Phase 6T - Infrastructure (RM2a) of Outline Planning Permission P14/V2873/O for all outstanding matters in relation to the development of infrastructure including spine road; noise bund with associated fence; landscaping; open space, including paths, LEAP and SuDS attenuation basin; infrastructure and works. (Amended Plans & Documentation Received 1st April 2026) Discharge of outline conditions 13 (Landscape Management Plan), 14 (Tree Protection Plan), 15 (Landscaping), 18 (Biodiversity Enhancement Plan) and 26 (Watercourse Ecological Buffer Zone) for this Phase of development.

    Granted Reserved matters Trees 281 docs
    Small domestic
  • Land to the West of Great Western Park (Valley Park) Didcot (in the parishes of Harwell and Milton)

    P14/V2873/O Submitted 19 Dec 2014 397m away

    Outline planning application for a residential development of up to 4,254 dwellings, mixed-use local centres, primary schools, sports pitches, community and leisure facilities, special needs school, open space and extensive green infrastructure, hard and soft landscaping, attenuation areas, diversions to public rights of way, pedestrian and vehicular access and associated works (as amended by drawings and information accompanying letter from Agent dated 10 March 2016, 21 August 2019, 24 January 2020, 30 March 2020, 20 May 2020 and 14 December 2020).

    Decided Outline New dwelling 322 docs
    Major scheme
  • Phase 6T (Clover Meadow), Land at Valley Park, Didcot

    P25/V0879/RM Submitted 17 Apr 2025 429m away

    Application for all outstanding reserved matters (layout, appearance, scale and landscaping) in relation to Phase 6T (Clover Meadow) for the development of 227 residential dwellings with associated parking, landscaping, infrastructure and works (pursuant to outline consent P14/V2873/O). An Environmental Statement was submitted with the outline application. (Amended Plans & Documentation Received 31 March 2026) Discharge of Outline Conditions 13 (Landscape Management Plan), 14 (Tree Protection Plan), 15 (Landscaping) and 18 (Biodiversity Enhancement Plan) for this Phase of development

    Granted Reserved matters Trees 675 docs
  • Walnut Tree Cottage Barrow Lane Harwell Oxfordshire OX11 0DY

    P11/V1808 Submitted 20 Aug 2011 484m away

    Proposed solar panels on south facing roof of existing outbuilding with extension to roof to accommodate proposed solar panels.

    Decided Extension 11 docs

In Vale of White Horse

  • O/S 36A Lashford Lane Dry Sandford Abingdon OX13 6DY

    Installation of 1 x 11m medium wooden pole

    21 Aug 2026 Telecoms
  • OS Wootton & Dry Sandford Community Centre Lamborough Hill Wootton Abingdon OX13 6DA

    Installation of 1x 9m Medium Wooden Pole

    20 Aug 2026 Telecoms
  • OS 25A Home Close Wootton Abingdon OX13 6DB

    Installation of 1 x 9m Medium Wooden Pole

    20 Aug 2026 Telecoms
  • Land at Joinery Display Systems Park Road Faringdon SN7 7BP

    The proposed upgrade of an existing telecommunications base station comprising the removal of the existing 17.5m pole, to be replaced by a proposed 20m monopole supporting 9 no proposed antennas, together with the replacement of 1 no existing ground-based cabinet with 1 no proposed cabinet, internal upgrades to the existing meter cabinet and ancillary development.

    17 Aug 2026 Telecoms
  • Abingdon Fire Station Ock Street Abingdon OX14 5DH

    The proposed development comprises the replacement of the existing 2m stub lattice tower with a 5m stub lattice tower mounted on the existing rooftop steel grillage, together with the installation of additional antennas and associated radio equipment. The proposal has been designed to utilise the existing telecommunications infrastructure and equipment compound wherever possible, avoiding the need for the establishment of a new telecommunications site.

    11 Aug 2026 Telecoms