Planning application
Down Barn Farm Sparsholt Wantage Oxfordshire OX12 9XD
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Erection of an Evoco 10kW turbine on a 15m tower
As published by the council, reference P11/V2449
Application record
- Reference
- P11/V2449
- Type
- Minor
- Status
- Rejected
- Decision
- Refusal of Planning Permission
- Received
- 7 Oct 2011
- Validated
- 10 Oct 2011
- Decided
- 11 Nov 2011
- Postcode
- OX12 9XD
Site history
Applications at this address on the Vale of White Horse register
This site has had 2 applications since 2010: 0 approved, 1 refused.
-
P10/V1439 Decided
Down Barn Farm Sparsholt Wantage Oxfordshire OX12 9XD
Converison of existing stables to holiday accommodation for tourists.
Timeline
Dates from the published record
-
7 Oct 2011
Received by Vale of White Horse
-
10 Oct 2011
Validated
Checked as complete and ready for consideration.
-
11 Nov 2011
Decision issued: Refusal of Planning Permission
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Vale of White Horse refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Vale of White Horse's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Down Barn Farm Sparsholt Wantage Oxfordshire OX12 9XD
Converison of existing stables to holiday accommodation for tourists.
Decided 20 docs -
Down Barn Farm Sparsholt Wantage OX12 9XD
Erection of a 15M (to hub) wind turbine with 2.75m blades.
Decided Full applications 10 docs